Loading...
HomeMy WebLinkAbout2004-Building (bath remodel)OSHKOSH ON THE WATER .lob,Address 935 MARICOPA DR Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN GYELL Contractor SCHOOL STATIONERS CORP Category 140 - Interior Remodeling No 107129 Create Date 03/29/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling the bathroom to include repairing the floor and re-drywalling. of Work HVAC Contractor Plumbing Contractor MOREMAN PLUMBING Electric Contractor Fees: Valuation $800.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 03/29/2004 Final/O.P. 00/00/0000 Permit Voided Parcel Id # 1313310000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1641 S MAIN ST Oshkosh WI 54902 - 0000 Telephone Number (800)-6376644 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.