HomeMy WebLinkAbout10. 19-622
DECEMBER 10, 2019 19-622 RESOLUTION
(CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 18-01 TO
ADVANCE CONSTRUCTION, INC. FOR KIENAST-PAULUS
LANDFILL GAS VENTING (848,673.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for construction
of the Keinast and Paulus Quarry landfill gas extraction system; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
ADVANCE CONSTRUCTION, INC.
2141 Woodale Avenue
Green Bay, WI 54313
Total Base Bid w/ Alternate No. 1 & 3: $848,673.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct No. 0323-0470-6401-06749 Contractual Services
0323-0470-6401-06849 Contractual Services
0323-0470-7216-63949 Land Improvement
r,A
City
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Co n Council
FROM: James Rabe, Director of Public Works
DATE: December 5, 2019
RE: Award Bid for Public Works Contract No. 18-01
Kienast-Paulus Landfill Gas Venting
Advance Construction, Inc. / ($848,673)
BACKGROUND
The former Kienast and Paulus Quarries have been the subject of investigations relating to the production
of landfill gases. The former quarries were utilized as landfills for a period of time after active quarrying
operations ceased. As solid waste decomposes and breaks down, it can produce a number of gases,
referred to as "landfill gases". One of the most dangerous of those landfill gases is methane. In certain
concentrations, methane can be explosive. This is especially dangerous within structures where any
ignition source going off within that concentration could result in the explosion of the structure.
The monitoring of these sites has shown methane levels in excess of the Lower Explosive Limit (LEL) in
several monitoring wells. These levels of methane pose a risk to the health and safety of nearby
properties. In order to protect the health and safety of the general public, the methane being generated
from these former quarries needs to be controlled.
The City hired AECOM Technical Services, Inc. (AECOM) to conduct a series of environmental
investigations and design a landfill gas extraction system.
ANALYSIS
Engineering Division staff reviewed the two (2) bids that were received for the project. The bid
documents contained three (3) alternates. The base bid includes complete construction of the Kienast
Quarry landfill gas extraction system and partial construction of the Paulus Quarry landfill gas extraction
system. Alternate 1 would complete the construction of the landfill gas extraction system at the Paulus
Quarry landfill. Alternate 2 would have the Contractor provide the topsoil required for this project.
Alternate 3 would have the City provide the topsoil. After review of the alternatives, it is recommended
to award Alternates No. 1 and 3 with the base bid. The low bid with Alternates No. 1 and 3 is $848,673
from Advance Construction, Inc. of Green Bay, Wisconsin.
1:\Engineering\2018CONl'RACPS\18-01 Kienast-Paulus Page 1 of 2
LF \ Project_Infurmation \ Correspondence \ Memo \ 18-01 Memo for Bid Aivard_12-5-19.docx
FISCAL IMPACT
Funding for this project is in the 2017, 2018, and 2019 Capital Improvement Programs (CIP). Following
is a summary of the available funds and the estimated total construction cost, including ancillary costs
such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction -
related expenses. The total cost for this project includes engineering services to be provided by AECOM.
Their proposal for this work has been submitted for consideration on this Council agenda.
Estimated Total Construction
CIP Section
CIP Funds Budgeted
Cost
Property
Improvements
$1,450,000
$1,261,626
Totals
$1,450,000
$1,261,626
RECOMMENDATIONS
I recommend award to the low bidder, Advance Construction, Inc. in the amount of $848,673.
Approved:
Mark A. Rohloff
City Manager
JER/tlt
L\Engineering\2018 CONTRACTS\18-01 Kienast-Paulus Page 2 of 2
LF \ Projecl_Information \ Correspondence \ Memo \ 18-01 Memo for Bid Award_12-5-19.docx
Contract 18-01- Kienast-Paulus Landfill Gas Venting Q6588486)
Owner. Oshkosh WI, City of
Solicitor. AECOM
Bid Opening: 12/02/201910:00 AM CST
Advance Construction Inc.
Vinton Construction Company
2141 Woodale Avenue
Green Bay, WI 54313
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 1: Base Bid
$682,153.00
$821,595.00
Installation of gas
collection trench and
collection/header piping;
including all backfill and
capping materials;
complete as specified (see
1005
Trench Section Detail)
Linear Feet
1,145.00
$110.00
$125,950.00
$218.00
$249,610.00
Installation of well head
manholes; control valves;
and sampling ports;
including all associated
piping and connections;
complete as specified (see
Trench Section at Manhole
Detail; and SDR-17
perforated landfill gas
collector pipe, Valve
1012
Bach
7.00
$9,700.00
$67,900.00
$9,997.00
$69,979.00
Installation of passive
venting and valve;
including tie -into gas
collection piping;
complete as specified (see
1015
Passive Vent Detail)
Each
5.00
56,000.00
$30,000400
$6,429.00
$32,145.00
Installation of blower
system; including
electrical and control
system and venting pipe;
complete as specified (see
Blower and Electrical
1022
Details)
Lump Sum
1.00
$117,850.00
$117,850.00
$113,000.00
$113,000.00
Start-up and
demonstration of landfill
gas system; complete as
1025
specified
Lump Sum
1.00
$8,000.00
$8,000.00
$5,000.00
$5,000.00
Mobilization; complete as
1050
specified
Lump Sum
1.00
$88,000.00
$88,000.00
$125,000.00
$125,000.00
8" concrete pavement;
with 6" CABC and
grading; complete as
1311
specified
Square Yards
290.00
$80.00
$23,200.00
$40.00
$11,600.00
i:Nr ".-'kaaEOOPIISAM'M' ximan rmam u:v �q�.Unrom��xoo�cono-m mm�iea� umr.,n_�z-z-w Page 1 of 5 12/2/2019
Contract 18-01- Kienast-Paulus Landfill Gas Venting (#6588486)
Owner. Oshkosh Wl, City of
Solicitor. AECOM
Bid Opening: 12/02/2019 moo AM CST
Advance Construction Inc.
Vinton Construction Company
2141 Woodale Avenue
Green Bay, WI 54313
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Pavement ties, complete
1350
as specified
Each
25.00
$10.00
$250.00
$8.00
$200.00
Drilled dowel bars, 1 1/4";
1354
complete as specified
Each
41.001
$13.00
$533.00
$14.00
$574.00
4" concrete sidewalk with
3" CABC and grading;
1500
complete as specified
Square Feet
115.00
$9.00
$1,035.00
$10.00
$1,150.00
Sawing concrete
pavement full depth;
1710
complete asspecified
Linear Feet
160.00
$4.00
$640.00
$4.00
$640.00
Furnish and install 10"
storm sewer; complete as
2002
specified
Linear Feet
105.00
$100.00
$10,500.00
$89.00
$9,345.00
Fumis an insta
standard storm sewer
inlet manhole (4'
diameter), complete as
2213
specified
Vertical Feet
12.00
$240.00
$2,880.00
$434.00
$5,208.00
Furnish and install storm
sewer marker balls;
2404
complete as specified
Each
2.00
$700.00
$1,400.00
$57.00
$114.00
Furnish and install storm
sewer clay dams;
2406
complete as specified
Each
3.00
$400.00
$1,200.00
$300.00
$900.00
Furnish; install; maintain,
and remove Type D
modified inlet protection;
2508
complete as specified
Each
12.00
$125.00
$1,500.00
$80.00
$960.00
Sediment removal - Type
D modified inlet
protection; complete as
2510
specified
Each
24.00
$70.00
$1,680.00
$5.00
$120.00
Furnish; install; maintain;
and remove stone
tracking pad, complete as
2512
specified
Each
1.00
$2,400.00
$2,400.00
$3,500.00
$3,500.00
Furnish; install; maintain;
and remove silt fence;
2514
complete as specified
I Linear Feet
1,980.00
$3.00
$5,940.00
$3.00
$5,940.00
Furnish and install turf
grass; complete as
I
2620
specified
Square Yards
18,700.00
$1.0()
$18,700.00
$0.65
$12,155.00
I:\FnglnmdnR\NIRfONTNA(l5\ltl-01 Klmart-PonIm LF\I'raka(Jnfmmatlon\Cantrucllnk\i8-01 Bid T 124-W Page of 12/2/2019
Contract18-01-Kienast-Paulus Landfill Gas Venting (u6588486)
Owner. Oshkosh WI, City of
Solicitor. AECOM
Bid Opening: 12102/201910:00 AM CST
Advance Construction Inc.
Vinton Construction Company
2141 Woodale Avenue
Green Bay, WI 54313
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Furnish and install
annual cover crop;
2624
complete as specified
Square Yards
18,700.001
$0.30
$5,610.00
$0.22
$4,114.00
Furnish and install Class
II; Type B erosion control
2634
mat; complete as specified
Square Yards
800.00
$3.00
$2,400.00
$1.60
$1,280.00
Furnish and install
reinforced grass
pavement system;
2640
complete as specified
Square Yards
555.00
$93.00
$51,615.00
$79.00
$43,845.00
Furnish and install
hydraulically -applied
erosion control product;
2644
complete as specified
Square Yards
17,900.00
$1.30
$23,270.00
$0.60
$10,740.00
Connect to existing storm
sewer manhole; complete
2856
as specified
Each
2.00
$1,000.00
$2,000.00
$900.00
$1,800.00
Connect to existing storm
sewer inlet; complete as
2858
specified
Each
2.00
$1,000.00
$2,000.00
$900.00
$1,800.00
Clear trees; complete as
2906
specified
Lump Sum
1.00
$7,500.00
$7,500.00
$8,200.00
$8,200.00
Clear shrubs; complete as
2908
specified
Lum Sum
1.00
$7,500.00
$7,500.00
$1,640.00
$1,640.00
Grub stumps; complete as
2912
specified
Lump Sum
1.00
$7,500.00
$7,500.00
$5,150.00
$5,150.00
Storm sewer utility line
opening (ULO); complete
2914
as specified
Each
2.00
$1,000.00
$2,000.00
$900.00
$1,800.00
Furnish and instal 6' high
temporary metal cyclone
fence and associated gate;
2946
complete as specified
Linear Feet
1,980.00
$10.00
$19,800.00
$5.70
$11,286.00
Excavation special
(storm); complete as
2950
specified
Tons
2,300.00
$18.00
$41,400.00
$16.00
$82,800.00
1:1.&—ne1—mNranc %—mua i—ma r.,n iz-z-iv Page 3of5 12/2/2019
Contract 18-01- Kienast-Paulus Landfill Gas Venting Q6588486)
Owner. Oshkosh WI, City of
Solicitor. AECOM
Bid Opening: 12/02/201910:00 AM CST
Advance Construction Inc.
Vinton Constn/ction Company
2141 Woodale Avenue
Green Bay, WI 54313
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 2: Alternate 1 (Awarded)
$78,320.00
$125,894.00
Installation of gas
collection trench and
collection/header piping;
including all backfill and
capping materials;
complete as specified (see
1005-1
Trench Section Detail)
Linear Feet
376.001
$120.00
$45,120.00
$218.00
$81,968.00
Installation of well head
manholes; control valves;
and sampling ports;
including all associated
piping and connections;
complete as specified (see
Trench Section at Manhole
Detail; and SDR-17
perforaated landfill gas
1012-1
collector pipe, Valve
Each
1.00
$9,700.00
$9,700.00
$9,997.00
$9,997.00
Installation of passive
venting and valve,
including tie -into gas
collection piping,
complete as specified (see
1015-1
Passive Vent Detail)
Each
1.00
$6,000.00
$6,000.00
$6,429.00
$6,429.00
Start-up and
demonstration of landfill
gas system; complete as
1025-1
specified
Lump Sum
1.00
$4,000.00
$4,000.00
$500.00
$500.00
Excavation special
(storm); complete as
2950-1
specified
'Ions
750 0(l
$18.00
$13,500.00
$36.00
$27,000.00
Section 3: Alternate 2 (Not Awarded)
$283,500.00
$170,100.00
Furnish and install topsoil
12" depth; complete as
2604-2
specified
Cubic Yards
6,300.00
$45.00
$283,500.00
$27.00
$170,100.00
I:\aglnrMng\ID MV AMij"1 Kle>v+nPadm LF\Pm Jnfwmadm\Cmtraf Inlo\INLI Bid Td 12Sd-1 Page 4 of 12/2/2019
Contract 18-01- Kienast-Paulus Landfill Gas Venting (A6588486)
Owner. Oshkosh WI, City of
Solicitor: AECOM
Bid Opening: 12/02/2019 10:00 AM CST
Advance Construction Inc.
Vinton Construction Company
2141 Woodale Avenue
Green Bay, WI 54313
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 4: Alternate 3 (Awarded)
$88,200.00
$122,850.00
2601-3
CONTRACTOR to screen;
pulverize; load; transport;
and grade CITY -provided
topsoil 12" in depth across
the site; complete as
Isvecified
Cubic Yards
1 6,300.001
$14.00
1 $88,200.00
1 $19.50
$122,850.00
Bid Total:
$848,673.00