HomeMy WebLinkAbout0107075-BuildingOSHKOSH
ON THE WATER
.lob Address 1346 OTTER AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TOM A/DENA M WULF
Contractor WULF RIVER CONSTRUCTION
Category 140 - Interior Remodeling
No 107075
Create Date 03/26/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Remodel the interior to include removal of lath and plaster and replace with drywall, installing new windows and headers for the window
of Work openings, adding a closet rearranging the rooms but not moving walls. All work shall conform with applicable cod
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
MASTER ELECTRIC INC
Plumbing Contractor UNKNOWN
$8,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$62.00 Park Dedication $0.00
Date 03/26/2004 Final/O.P. 00/00/0000
Parcel Id # 0205670100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address E7671 WEILAND RD NEW LONDON WI 54961 - 0000 Telephone Number
920-982-2519
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.