HomeMy WebLinkAbout0107126 BOSHKOSH
ON THE WATER
.lob .Address 1319 HIGH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner RIVER VALLEY CHURCH
Contractor OWNER
Category 161 - Wrecking Residential Dwellings
No 107126
Create Date 11/1 $/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature RAZE / Raze single family home. Prior to the demolition of any building which may contain or is known to contain asbestos you must notify the
of Work DNR at least 10 working days before starting the work. All material is required to be properly disposed of.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$5,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$40.00 Park Dedication $0.00
Date 03/29/2004 Final/O.P. 00/00/0000
Parcel Id # 1202740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1331 HIGH AVE OSHKOSH WI 54901 - 2710 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.