Loading...
HomeMy WebLinkAbout0107078-PlumbingOSHKOSH ON THE WATER ,Job Address 450-480 N KOELLER ST Contractor O'NEILL ENTERPRISE INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner DUMKE & ASSOCIATES LLC Category 440- Industrial-Interior Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 1 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink Toilet 1 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 18 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 1 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 107078 Create Date 03/26/2004 Plan C5-84-0304-P 0 Gar Drain 1 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 EyeWash Statn 0 0 0 0 0 0 0 0 0 Use/Nature of Work DENTAL CLINIC Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $24,000.00 Plan Approval $0.00 Permit Fees $147.00 ~ Permit Voided Issued By Parcel Id # Date 03/26/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5575 CTY RD N PICKETT WI 54964 - 0000 Telephone Number 920-428-4700 589-2 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.