HomeMy WebLinkAbout0107078-PlumbingOSHKOSH
ON THE WATER
,Job Address 450-480 N KOELLER ST
Contractor O'NEILL ENTERPRISE INC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DUMKE & ASSOCIATES LLC
Category 440- Industrial-Interior
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 1 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink
Toilet 1 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 18 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 1 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 107078
Create Date 03/26/2004
Plan C5-84-0304-P
0 Gar Drain
1 Soda Disp
0 Coffee Maker
0 Int Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 EyeWash Statn
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
DENTAL CLINIC
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $24,000.00 Plan Approval $0.00 Permit Fees $147.00 ~ Permit Voided
Issued By
Parcel Id #
Date 03/26/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5575 CTY RD N PICKETT WI 54964 - 0000 Telephone Number
920-428-4700 589-2
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.