Loading...
HomeMy WebLinkAbout0107063-BuildingNo107063 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER CO OSHKOSH PEPSI COLA BOTTLING Job Address2541 W 20TH AVEOwnerCreate Date03/23/2004 DesignerTriad EngineeringContractorMIRON CONSTRUCTION CO INC Category210 - Addition IndustrialPlanK2-005-0104 TypeBuildingSignCanopyFenceRaze M3 ZoningClass of Const:Size10800 sq ft Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 10800Sq. Ft.Bedrooms0Stories1Canopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitRequiredFlood PlainNoHeight PermitNot Required Park DedicationNot Required# Dwelling Units0# Structures1 IND / 10800 Sq Ft Addition for water treatement room expansion as per Transaction ID # 957113 Above grade work. Landscaping must Use/Nature comply with requirements of planning department. of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$559,388.00Plan Approval$0.00Permit Fee Paid$1,769.00Park Dedication$0.00 03/25/200400/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #1328580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner PO BOX 509NEENAHWI549570509920-969-7053 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.