CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
CO OSHKOSH PEPSI COLA BOTTLING
Job Address2541 W 20TH AVEOwnerCreate Date03/23/2004
DesignerTriad EngineeringContractorMIRON CONSTRUCTION CO INC
Category210 - Addition IndustrialPlanK2-005-0104
TypeBuildingSignCanopyFenceRaze
M3
ZoningClass of Const:Size10800 sq ft
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
10800Sq. Ft.Bedrooms0Stories1Canopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitRequiredFlood PlainNoHeight PermitNot Required
Park DedicationNot Required# Dwelling Units0# Structures1
IND / 10800 Sq Ft Addition for water treatement room expansion as per Transaction ID # 957113 Above grade work. Landscaping must
Use/Nature
comply with requirements of planning department.
of Work
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$559,388.00Plan Approval$0.00Permit Fee Paid$1,769.00Park Dedication$0.00
03/25/200400/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1328580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
PO BOX 509NEENAHWI549570509920-969-7053
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.