HomeMy WebLinkAbout0107043-Plumbing (water heater)OSHKOSH
ON THE WATER
.lob Address 1810 OMRO RD
Contractor GRP MECHANICAL INC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WALLACE/AUDREY WAGNER
Category 441 - Industrial-Water Heaters
No 107043
Create Date 03/24/2004
Plan
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
DOMESTIC HOT WTR
*EIV BEEZ ELEC
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $6,000.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
1610870000
Date 03/24/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 730 HAWTHORNE DR OMRO WI 54963 - 0000 Telephone Number
920-685-0990
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
· .,~, ,.-, ,.~o, o'.; ~.'~ ~;ZI~317255
Electric lustallation Verification
O) (we) ~
have bceu comrao~ to perform ek~ulo [nsta~fion work for ~
The tatum or,he work comht$ of: (Check One or Describe the Natme of Work)
P, ecom~ction or new c~uit For ~p~aceme~t Heati~ Plant ~ ~ Con~.
~ ~c a ~ate
Thc vilue oftl~s work is
I hereby ver~ this work ~ be pedoflned by an employce of ~s company i ~ ve~fy the
reconnection / ~ vfl~l be done in compliance ~with ma~e~ and Electric code
req~rements.
(S~ntur~ of Company Offtcm')