Loading...
HomeMy WebLinkAbout0106942-Building€ i r ,i � , . . , � � • CITY OF OSHKOSH , STANDARD CONDITIONS OF APPROVAL Project Address 3391> �"�c�,f'T.9DT R.1� Permit# Please read the following information and sign at the bottom to acknowledge th t you have read and agree to comply with these conditions. 1. All habitable rooms must be provided with 8% light and 3.5%ventilatio . Bedrooms � located on the second floor or below ground level must be provided with egress windows � in addition to the light and ventilation requirements. Basement windows are also � required to have window well areas in accordance with ILHR 21.03. 2. Garage spaces shall be separated from the dwelling unit in accordance th ILHR 21.08. The door and frame assembly between the dwelling unit and an attached arage shall be labeled by an independent testin�a ency as having a minimum fire-resis ive rating of 20 � minutes. All drywall joints are required to be taped/sealed unless the joi ts are fitted so that the gap is no more than a dimes thickness ( 1/20-inch) and backed b solid wood or � drywall with the joints staggered. � 3. All penetrations in exterior walls must be sealed prior to the insulation ' pection. This ' includes holes in the top and bottom plates, gaps around heating ducts, d holes in the return air spaces. 4. Smoke detectors are required on every floor and within 6' of all bedroom . The smoke detectors are required to be hardwired and interconnected. 5. Hydromassage tubs are required to have an access panel to motor. The a cess panel must be accessible without removing the finish of the house. 6. All overframing must be designed by the truss manufacturer, according t standards set by the truss plate institute, or structural calculations must be provided pri r to the rough � building inspection. � � 7. Truss plans must be submitted and approved prior to framing the roof. � � 8. Truss plans including the truss layout must be provided on site at the rou h building � inspection. In addition to the truss plans, microlam calculations must be rovided on site � at the rough building inspection for all microlams with point loads on th . � 9. Calculations must be rovided for all cantilevered floors with oint loads Floor trusses � P P � and TJI's must be designed for the cantilevered areas. � � � � € � � � � � t � , . . • � �. 10. The property owner and applicant is responsible for compliance with ILHR 21,125 ' (Erosion Control). When installing access drives, a minimum of 2"-3" diameter stone is required in addition to a minimum of 6" depth, 30'-50' length, and 14'-20'width. Erosion control measures must be maintained until the lawn is established. 1 l. All storm sewer inlets must be protected with approved erosion control devices. Tracking (i.e. sediment)must be removed from the street at the end of each workday. Repair any siltation or erosion damage to adjoining surfaces and drainageways resulting from land development or disturbing activities. 12. The building placard must be posted on site at all times. Once the rough framing is up the placard must be posted on the patio door or on a kitchen window. If the placard is not present at any inspection, stop work orders will be posted. Additional placards can be obtained through our department if the cards are misplaced. 13. All mechanicals must be roughed in prior to requesting the rough building inspection. If on the inspection the mechanicals are not roughed in,the inspection will fail and a$100 re-inspection fee will be charged. 14. Attached is a copy of the final inspection checklist. At the final inspection all items on this list must be completed to avoid the$100 re-inspection fee per inspection. 15. When requesting final inspections please note that a minimum of 2 days notice is needed from the time the inspection is ready. Furniture is only allowed to be placed in the center of the garage floor and a minimum of a 3'pathway must be provided around the walls of the garage. At the final inspection no furniture or personal belongings aze allowed in the house. Appliances such as the stove,refrigerator, washer, and dryer are not to be set in place due to the electrical inspector needing to look at the power serving the appliances. A 6' stepladder must be on site at the final inspection to provide access to the attic. 16. The building placard must remain on the patio door or on a kitchen window until occupancy is approved. Occupancy is not allowed prior to the placard having all of the final inspection approved stickers on the backside. If occupancy occurs prior to the inspections being approved daily citations will be issued with no further notice being given. 17. All site grading must be done in accordance with the approved drainage plan on file in the public works office, 3rd floor. �i�nafure o��pp�canf: eCJafe: Q �