Loading...
HomeMy WebLinkAbout0106982-Building (roof)OSHKOSH ON THE WATER .lob .Address 306 SARATOGA AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID M CECH/H RASMUSSEN Contractor OWNER Category 141 - Exterior Remodeling No 106982 Create Date 03/22/2004 Plan Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Removing the existing 3 layers of roofing and replacing with new asphalt shingles. No structural work. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $44.00 Park Dedication $0.00 Date 03/22/2004 Final/O.P. 00/00/0000 Parcel Id # 1008160000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1618 CHESTNUT ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.