HomeMy WebLinkAbout0106884-Building (roof)OSHKOSH
ON THE WATER
JobAddress 1514 OREGON ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner RMKELLC
Contractor LAKEWOOD ROOFING
Category 232 - Alteration Stores & Customer Service
No 106884
Create Date 03/15/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Tavern & Apartments/Reroof upper section of roof. Tear off existing, install fiber board and 60 mil EPDM membrane. Flash as
of Work required/necessary.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$7,800.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$82.00 Park Dedication $0.00
Date 03/15/2004 Final/O.P. 00/00/0000
Parcel Id # 0304880000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address P.O. BOX 15 WINNEBAGO WI 54985 - 0015 Telephone Number 235-1955
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.