Loading...
HomeMy WebLinkAbout0106876-Building (roof/siding)OSHKOSH ON THE WATER .lob.Address 2350 FALL CREEK LN Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TODD H/KIMBERLY SCHATZ Contractor RELIANT ROOFING Category 141 - Exterior Remodeling No 106876 Create Date 03/15/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Replacing roofing and siding. No structuralwork. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: UNIVERSAL ELECTRICAL CONTRACTOR LL Plumbing Contractor $13,442.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $94.00 Park Dedication $0.00 Date 03/15/2004 Final/O.P. 00/00/0000 Parcel Id # 0614404600 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5438 LONG CT APPLETON WI 54914 - 0000 Telephone Number 954-5975 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.