Loading...
HomeMy WebLinkAbout0106845-BuildingOSHKOSH ON THE WATER .lob .Address 2021 WILSON AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner SCOTTA/LISA H HUTCHINSON Contractor OWNER Category 140 - Interior Remodeling No 106845 Create Date 03/10/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Finishing off a portion of the basement to include a rec room. Ceiling height shall be a minimum of 7' with no projections lower than 6'-4". of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 03/10/2004 Final/O.P. 00/00/0000 Parcel Id # 1212200000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 0 0m 0 v -n s. 1 ao 6 sz o 0 i 0 s s i le s. 6' N a 6 -3'''.5 r d7 3' m i 6' O O C �j i I O C 3 F T tri to tr1 A Z5 tTI a o r" cnc z x X N O O O rri C) CA r-1 CA 0 rn z ti