Loading...
HomeMy WebLinkAbout0106797-Building (drywall interior)OSHKOSH ON THE WATER .lob Address 1069 BISMARCKAVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner BRETT J PIRLOT Contractor OWNER Category 140 - Interior Remodeling No 106797 Create Date 03/05/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Removing paneling and installing drywall in the kitchen, 2 bedrooms and the bathroom. No structural work. Any walls without headers of Work above any wall openings will need to have them installed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $26.00 Park Dedication $0.00 Date 03/05/2004 Final/O.P. 00/00/0000 Parcel Id # 0608170000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1069 BISMARCK AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.