Loading...
HomeMy WebLinkAbout15. 19-577 NOVEMBER 12, 2019 19-577 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD DEMOLITION BID FOR 43 E. 7TH AVENUE BLOCK TO LINNCO, INC. $467,714.50 INITIATED BY: COMMUNITY DEVELOPMENT WHEREAS, the City of Oshkosh has heretofore advertised for bids for demolition of 43 E. 7h Avenue block; and WHEREAS, upon the opening and tabulation of bids it appears that the following is the most advantageous bid: LinnCo, Inc. 2 Second Ave S, #160 Sauk Rapids, MN 56379 TOTAL BASE BID $ 203,198.00 ALTERNATE 1 $ 37,618.25 ALTERNATE 2 $ 78,780.00 ALTERNATE 3 $ 99,888.00 ALTERNATE 4 $ 42,710.00 ALTERNATE 5 $ 5,520.00 TOTAL BID $467,714.50 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that said partial base bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0534-1040-7216-67903 TID #20 South Shore Redevelopment Acct. No. 0534-1040-7216-67904 TID #20 South Shore Redevelopment �'�'`�ems, g � Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis, Community Development Director DATE: November 5, 2019 RE: Award Demolition Bid for 43 E. 7th Block to LinnCo Inc. ($467,714.50) BACKGROUND The City has acquired the properties over the past several years in anticipation of redevelopment consistent with the Southshore Redevelopment Plan and TIF #20. Phase 1 Environmental Site Assessments (ESA) have been completed. The demolition of the structures must be completed in order to perform Phase 2 Environmental testing. All these efforts are in anticipation of issuing a Request for Proposals (RFP) for the redevelopment of this area in the near future. ANALYSIS The proposed demolition contract will remove the buildings and any hard surfaces on the properties. Available materials will be recycled including the concrete and asphalt which will be crushed and reused for back fill as needed, and stockpiled for future use on 9th Ave and/or the Pioneer Drive riverwalk. The contract also requires the grading, top soil and seed and hydro mulch so that the site will be development ready and attractive. FISCAL IMPACT TIF #20 has the cash on hand for this contract. The draft 2020 CIP has identified the projects and staff is proposing to accelerate the demolition by a few months and award the demolition contract in 2019. RECOMMENDATION Council awards the demolition bid to LinnCo for$467,714.50. Submitted, Approved: Allen Davis Mark A. Rohloff Community Development Director City Manager City Hall,215 Church Avenue P.O Box 1130 Oshkosh,WI 54903-1130 920 236 5000 hffp//www.ci oshkosh.wr us ..... . ..... . . 6 �5 c;cz;C=; c; c;6 c;cs 6 c5 c5 c;6 ..00000.. . .... I I 1 1 C�C� I..I.. R cli 't clt-i Iq ol 1.oll.1.1 oa a oo.o.8.1 0 0 0 0 ol 8.1 .1 8 6 6 Ili g 6 6 6 c;6 6 c; S 188181 18 o c:t R C:t R R �c ol R c� o. c o I I I I I o I c�R o.. . . ... 6 6 zi c:5 c5 6 6 6... 6.1 q q .6 6 A ci n cA ci 88. 8 4 vt 5 c;c,� &� -Z .' ; 6 �4 M g 8 .1 818 881 o 0 s ol ol 0 1..1 0.1.1.10=8 .1 8 8 8 I- c;ci S c;6 . . . . . . . . . =11=2 88, 8", z ... ...I Iz . . . . V, c; c�r c5 6 c5 4 Ili 14 c;I o- I C p P 8 o. g6 WIli p o 4 4"r at-: c�4 P Z lo as 1.0 0 0o.1..1 8 01.1.1.o8 .1.1.1 11 1.8 o. .1 1" .5 6 c5 c5 I-i a6 6 14 14 4 'r 4 a m li 14 1� 4� C4 U -4 r4 o o I o.I I 1 0 0 0 0 o088,00.0 01.1.1..1 18 a 0 o oo c5 .o0a' . . . . Ilo.8 2 n vt sk 1. "t E R 9 8 8 8 66.5616 1 o o o 1 16 Is 6 16 c5 6 16 41-1 11 "I.,- ;�11 1.1 2 p 'i a a c5 c5 1:a Vi lid ..... . .1 o.1.. 8. 8.S.S.881. o.o.o. 8 8 8 8 2 o6666.6 c- 6 6 4 Id T llt 6 o c5 6 4 II R IS-1 .1 .1 1.1 o 0o0 ooao s 6 c5 64 6 18 c;6 6 Nb 4 c;c;c5 1"1 81 6 6 c5 ow 1�cl;06 an uws Ti- I' I W 0 1 1. Bo I E pq E .oZ 0 :�j F. IR A A E A 1-2 o 0 -0d 0, 1 4 4-4 4 A -I- T'l 101 -1