Loading...
HomeMy WebLinkAbout0106761 BOSHKOSH ON THE WATER .lob.Address 234 N CAMPBELL RD Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH Contractor OWNER Category 262 - City of Oshkosh-Alteration No 106761 Create Date 03/04/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Senior Center Annex/Install partition walls to increase size of exercise room. Expand room to the east. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $0.00 Park Dedication $0.00 Date 03/04/2004 Final/O.P. 00/00/0000 Parcel Id # 0608040100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1130 Agent/Owner OSHKOSH WI 54903 - 1130 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.