Loading...
HomeMy WebLinkAbout0106722-Plumbing (addn to #105408)OSHKOSH ON THE WATER .lob Address 2440 SHORE PRESERVE DR Contractor RAUSCH PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 2 Lndry Tray Toilet 1 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner RYAN W/MEGAN M REDDY Category 410 - Residential-Interior No 106722 Create Date 02/23/2004 Plan 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 1 Use/Nature of Work XTRA FXTS TO PERMIT 105408 Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $500.00 Plan Approval $0.00 Permit Fees $28.00 ~J Permit Voided Issued By Parcel Id # 1281050000 Date 03/03/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1604 W HASKEL ST APPLETON WI 54914 - 0000 Telephone Number 830-9222 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.