HomeMy WebLinkAbout06. 19-554 OCTOBER 22, 2019 19-554 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 PUBLIC WORKS CONTRACT NO. 18-02 LIBBEY/NICOLET WATERSHED / NORTH MAIN STREET AREA DETENTION BASIN /RC EXCAVATING, INC. (-188,637.54) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: RC EXCAVATING, INC. 3125 Birch Road,Suite D Suamico, WI 54173 Net Decrease to Contract: ($188,637.54) PURPOSE: See attached Change Order. City of W Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: October 17, 2019 RE: Change Order No. 1 for Public Works Contract No. 18-02 Libbey/Nicolet Watershed/North Main Street Area Detention Basin RC Excavating, Inc. (-$188,637.54) BACKGROUND Change Order No. 1 for Contract 18-02 is scheduled for consideration by the Common Council at the October 22, 2019 meeting. The contract was originally awarded to RC Excavating, Inc. in May of 2018. This change order is for additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Streets-Final quantities adjusted to match field conditions. • Storm Sewer-Final quantities adjusted to match field conditions. • Sanitary Sewer-Final quantities adjusted to match field conditions. • Water Main-Final quantities adjusted to match field conditions. • Sidewalk-Final quantities adjusted to match field conditions. FISCAL IMPACT New Construction Contract Section Change Order Amount Costs with Engr CIP Budget Amount Street* $9,541.18 $82,012.49 $75,000 Storm Sewer -$162,056.02 $4,945,473.07 $5,150,000 Sanitary Sewer -$33,444.00 $5,824.07 $45,000 Water Main -$2,608.00 $6,927.38 $15,000 Sidewalk -$70.70 $11,362.42 $15,000 Total -$188,637.54 $5,051,599.43 $5,300,000 Note: the budget lines item denoted with an asterisk(*) include budget transfers from other projects. The Street CIP includes a$10,000 transfer from Contract 18-04. 1:\Engineering\2018 CONTRACTS\18-02 Libbey-N Main Det Page 1 of 2 Basin\Project_Information\Correspondence\Memo\18-02 Memo for CO A 1_10-17-19.docx Funding for the Streets portion of this project is available from other projects coming in under budget. Adequate funds are available in the other relating sections of the 2018 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 18-02 in the amount of ($188,637.54) to RC Excavating, Inc. Approved: John Fitzpatrick Assistant City Manager JG/tlt I:\Engineering\2018CONTRACTS\18.02 Libbey-N Main Det Page 2 of 2 Basin\Project_Information\Correspondence\Memo\18-02 Memo for CO*1_1 D-17-19.docx TO: RC EXCAVATING INC. CHANGE ORDER#1 (REVISED FINAL) 3125 BIRCH ROAD, SUITE D DATE: OCTOBER 7,2019 SUAMICO,WI 54173 Your present contract with the City of Oshkosh, Contract No. 18-02, awarded May 22, 2018, is hereby amended and changed as follows: NET DECREASE TO SECTION: ($250,516.70) NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO CONTRACT ($188,637.54) SECTION I TOTALS BID TOTAL $4,798,337.95 $4,798,337.95 CO#1 ($188,637.54) ($188,637.54) CONTRACT TOTAL $4,609,700.41 $4,609,700.41 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: ontracto I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) 18-02 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER OUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing pavement; Square 1100 complete as specified Yards 7,084.00 6,861.30 -222.70 $5.00 ($1,113.50) Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Feet 5,368.00 4,590.41 -777.59 $0.60 ($466.54) Removing existing silt and safety fencing; Linear 1190 complete as specified Feet 1,060.00 1,054.70 -5.30 $1.30 ($6.89) Removing and salvaging existing chain-link fencing and gate;complete as Linear 1191 specified Feet 1,930.00 1,930.00 $2.05 8"concrete pavement; with 6"CABC and grading;complete as Square 1311 specified Yards 4,380.00 4,776.10 396.10 $52.00 $20,597.20 Pavement ties; complete 1350 as specified Each 150.00 214.00 64.00 $8.10 $518.40 Drilled dowel bars;1 1/4"; 1354 complete as specified Each 270.00 130.00 -140.00 $14.25 ($1,995.00) Adjust manholes and inlets;complete as 1360 specified Each 63.00 57.00 -6.00 $305.00 ($1,830.00) Turf restoration;complete Square 1370 as specified Yards 1,575.00 1,800.06 225.06 $9.00 $2,025.54 30"curb and gutter;8"; with 6"CABC and grading;complete as Linear 1442 specified Feet 1,080.00 377.50 -702.50 $28.00 ($19,670,00) 36"mountable curb and gutter;8";with 6"CABC and grading;complete as Linear 1450 specified Feet 77.00 199.00 122.00 $40.50 54,941.00 4"concrete sidewalk with • 3"CABC and grading; Square 1500 complete as specified Feet 1,840.00 2,599.08 759.08 $6.05 $4,592.43 6"concrete sidewalk/ driveway/ramp with 3" CABC and grading; Square 1510 complete as specified Feet 4,840.00 3,977.99 -862.01 $7.35 ($6,335.77) Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 48.00 48.00 $35.00 No.4 reinforcing rods- deformed;epoxy-coated; Linear 1550 complete as specified Feet 75.00 0.00 -75.00 $1.25 ($93.75) Drilled No.4 sidewalk tie bars-deformed;epoxy- coated;complete as 1560 specified Each 31.00 36.00 5.00 $5.05 $25.25 Locate existing property monuments;complete as 1650 specified Each 5.00 0.00 -5.00 $250.00 ($1,250.00) Locate existing survey monuments;complete as 1651 specified Each 1.00 0.00 -1.00 $250.00 ($250.00) Replace existing property monuments;complete as 1652 specified Each 5.00 0.00 -5.00 $250.00 ($1,250.00) Page 1 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE- CONTRACT PRICE Replace existing survey monuments;complete as 1653 specified Each 1.00 0.00 -1.00 $250.00 ($250.00) Sawing existing pavement;complete as Linear 1700 specified Feet 280.00 337.60 57.60 $2.00 $115.20 Sawing concrete pavement full depth; Linear _ 1710 complete as specified Feet 1,120.00 1,597.35 477.35 $2.00 $954.70 Tack coat;complete as 1900 specified Gallons 141.00 125.00 -16.00 $4.05 ($64.80) 4"asphaltic pavement LT with 10"CABC and grading;complete as Square 1906 specified Yards 396.00 419.00 23.00 $48.50 $1,115.50 5"asphaltic transition MT with 10"CABC and grading;complete as Square 1910 specified Yards 44.00 0.00 -44.00 $70.00 ($3,080.00) Furnish and install Jackson Street pavement; Square 1920 complete as specified Yards 1,498.00 1,574.50 76.50 $80.00 $6,120.00 Furnish and install 8" storm sewer;complete as Linear 2001 specified Feet 378.00 355.50 -22.50 $68.50 ($1,541.25) Furnish and install 12" storm sewer;complete as Linear 2003 specified Feet 446.00 360.60 -85.40 $76.00 ($6,490.40) Furnish and install 21" storm sewer;complete as Linear 2012 specified Feet 5.00 0.00 -5.00 $114.00 ($570.00) Furnish and install 24" storm sewer;complete as Linear 2015 specified Feet 260.00 213.90 -46.10 $107.00 ($4,932.70) Furnish and install 27" storm sewer;complete as Linear 2018 specified Feet 60.00 71.80 11.80 $127.00 $1,498.60 Furnish and install 30" storm sewer;complete as Linear 2021 specified Feet 260.00 247.00 -13.00 $137,00 ($1,781.00) Furnish and install 36" storm sewer;complete as Linear 2024 specified Feet 490.00 467.70 -22.30 $132.00 ($2,943.60) Furnish and install 42" storm sewer;complete as Linear 2027 specified Feet 10.00 14.00 4.00 $360.00 $1,440.00 Furnish and install 48" storm sewer;complete as Linear 2030 specified Feet 420.00 402.00 -18.00 $127.00 ($2,286.00) Furnish and install 54" storm sewer;complete as Linear 2033 specified Feet 650.00 611.00 -39.00 $208.00 ($8,112.00) Furnish and install 60" storm sewer;complete as Linear 2036 specified Feet 460.00 434.05 -25.95 $167.00 ($4,333.65) Furnish and install 29"x 45"HERCP Class III storm sewer; complete as Linear 2051 specified Feet 10.00 8.00 -2.00 $263.00 ($526.00) 60"HERCP Class III storm sewer;complete as Linear 2055 specified Feet 90.00 66.50 -23.50 $278.00 ($6,533.00) Page 2 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 5'x 8' box culvert storm sewer; Linear 2079 complete as specified Feet 120.00 120.00 $860.00 Furnish and install 5'x 8' • box culvert storm sewer with manhole or inlet riser;complete as Linear 2103 specified Feet 11.00 11.00 $885.00 RCP Class Ill apron endwall with joint ties; 2140 complete as specified Each 2.00 2.00 $895.00 Furnish and install 24" RCP Class III apron endwall with joint ties; 2144 complete as specified Each 1.00 1.00 $1,125.00 RCP Class III apron endwall with joint ties; 2145 complete as specified Each 1.00 1.00 $1,210.00 RCP Class III apron endwall with joint ties; 2149 complete as specified Each 1.00 1.00 $2,175.00 RCP Class III apron endwall with joint ties; 2150 complete as specified Each 1.00 1.00 $3,375.00 RCP Class III apron endwall with joint ties; 2151 complete as specified Each 2.00 2.00 $3,950.00 Furnish and install 5'x 8' box culvert end section with joint ties; complete 2178 as specified Each 1.00 1.00 $11,050.00 Furnish and install 8" perforated underdrain pipe;complete as Linear 2190 specified Feet 5,000.00 4,743.50 -256.50 $74.00 ($18,981.00) Furnish and install standard storm sewer manhole(5'diameter); Vertical 2202 complete as specified Feet 38.00 38.31 0.31 $571.00 $177.01 Furnish and install standard storm sewer manhole(8'diameter); Vertical 2205 complete as specified Feet 42.00 42.03 0.03 $729.00 $21.87 Furnish and install standard storm sewer inlet manhole(4' diameter);complete as Vertical 2213 specified Feet 13.00 11.96 -1.04 $484.00 ($503.36) Furnish and install standard storm sewer inlet manhole(5' diameter);complete as Vertical 2214 specified Feet 15.00 14.33 -0.67 $657.00 ($440.18) Furnish and install standard storm sewer inlet manhole(8' diameter);complete as Vertical 2217 specified Feet 43.00 42.66 -0.34 $853.00 ($290.02) Furnish and install storm sewer junction chamber M-1;complete as 2225A specified Each 1.00 1.00 $45,500.00 Page 3 or 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install storm sewer junction chamber M-14;complete as • 2225B specified Each 1.00 1.00 $19,250.00 Furnish and install storm sewer outlet structure; 2226 complete as specified Each 1.00 1.00 $9,100.00 Furnish and install standard storm sewer manhole riser(4' diameter); complete as Vertical 2227 specified Feet 5.00 4.81 -0.19 $165.00 ($31.35) Furnish and install Type 3 inlet(with 18"sump); 2237 complete as specified Each 7.00 9.00 2.00 $2,050.00 $4,100.00 Furnish and install 6" storm sewer lateral; Linear 2400 complete as specified Feet 209.00 136.30 -72.70 $51.00 ($3,707.70) Furnish and install storm sewer marker balls; 2404 complete as specified Each 21.00 20.00 -1.00 $41.00 ($41.00) Furnish and install storm sewer clay dams; 2406 complete as specified Each 7.00 5.00 -2.00 $255.00 ($510.00) Furnish and install storm sewer lateral inlet; 2408 complete as specified Each 4.00 3.00 -1.00 $760.00 ($760.00) Storm lateral inlet adjustments;complete as 2414 specified Each 4.00 3.00 -1.00 $505.00 ($505.00) Furnish;install; maintain; and remove Type D modified inlet protection; 2508 complete as specified Each 46.00 52.00 6.00 $140.00 $840.00 Sediment removal-Type D modified inlet protection;complete as 2510 specified Each 46.00 0.00 -46.00 $1.00 ($46.00) Furnish;install;maintain; and remove stone tracking pad;complete as 2512 specified Each 4.00 3.00 -1.00 $2,500.00 ($2,500.00) Furnish;install;maintain; and remove silt fence; Linear 2514 complete as specified Feet 3,339.00 2,017.50 -1,321.50 $1.65 ($2,180.48) Furnish;install;maintain; and remove silt fence/tracking pad at Southwest Industrial Park;complete as Lump • 2514E specified Sum 1.00 0.00 -1.00 $2,685.00 ($2,685.00) Install salvaged topsoil 6" depth;complete as Square 2602 specified Yards 42,630.00 18,648.00 -23,982.00 $0.80 ($19,185.60) Install salvaged topsoil 12"depth; complete as Square 2606 specified Yards 2,835.00 2,088.50 -746.50 $3.00 ($2,239.50) Furnish and install aquatic fencing; complete Linear 2609 as specified Feet 1,754.00 1,660.90 -93.10 $3.65 ($339.82) Furnish and install native seeding;complete as Square 2610 specified Yards 10,773.00 3,842.10 -6,930.90 $0.90 ($6,237.81) Page 4 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM IT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install native seeding;complete as Square 2612 specified Yards 18,281.00 17,653.10 -627.90 $0.70 ($439.53) Furnish and install turf grass;complete as Square 2620 specified Yards 3,486.00 3,296.30 -189.70 $0.50 ($94.85) Furnish and install no- mow fescue;complete as Square 2622 specified Yards 10,028.00 9,546.00 -482.00 $0.45 ($216.90) Furnish and install annual cover crop;complete as Square 2624 specified Yards 42,567.00 45,702.68 3135.68 $0.15 $470.35 Furnish and install trees; 2626 complete as specified Each 15.00 15.00 $495.00 Furnish and install shrubs;complete as 2628 specified Each 53.00 53.00 $105.00 Furnish and install Class I;Type A erosion control mat;complete as Square 2630 specified Yards 42,567.00 34,180.90 -8,386.10 $1.00 ($8,386.10) Furnish and install medium rip-rap with filter fabric;complete as Square 2648 specified Yards 2,795.00 2,536.60 -258.40 $35.00 ($9,044.00) Furnish and install heavy rip-rap with filter fabric; Square 2650 complete as specified Yards 644.00 440.00 -204.00 $36.00 ($7,344.00) Furnish and install Scour Stop;complete as Square 2653 specified Yards 265.00 229.80 -35.20 $90.00 ($3,168.00) Strip topsoil and restore stockpile at Southwest Industrial Park;complete Square 2654 as specified Yards 182.00 0.00 -182.00 $8.00 ($1,456.00) Abandon 8"-12"storm sewer;complete as Linear 2800 specified Feet 360.00 379.10 19.10 $8.00 $152.80 Abandon 15"and larger storm sewer;complete as Linear 2802 specified Feet 2,850.00 2,123.00 -727.00 $58.00 ($42,166.00) Remove 30"and smaller storm sewer;complete as Linear 2804 specified Feet 290.00 245.80 -44.20 $22.00 ($972.40) Remove 33"-60"storm sewer;complete as Linear 2806 specified Feet 60.00 121.90 61.90 $36.00 $2,228.40 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 2.00 1.00 -1.00 $810.00 ($810.00) Remove storm sewer manholes and inlets; 2812 complete as specified Each 2.00 2.00 $525.00 Remove and dispose of existing bulkhead in MH 12-737;complete as 2813 specified Each 1.00 1.00 $2,025.00 Connect to existing storm sewer main;complete as 2850 specified Each 15.00 16.00 1.00 $1,525.00 $1,525.00 Page 5 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Connect to existing storm sewer lateral;complete 2852 as specified Each 3.00 4.00 1.00 $1,225.00 $1,225.00 Connect to existing storm sewer manhole;complete 2856 as specified Each 1.00 1.00 $1,850.00 Connect to existing storm sewer inlet;complete as 2858 specified Each 1.00 0.00 -1.00 $1,550.00 ($1,550.00) Mobilization;complete as Lump 2900 specified Sum 1.00 1.00 $105,000.00 Strip and stockpile topsoil;complete as Square 2902 specified Yards 36,000.00 34,128.00 -1,872.00 $0.25 ($468.00) Clear trees; complete as Lump 2906 specified Sum 1.00 1.00 $15,000.00 Clear shrubs;complete Lump 2908 as specified Sum 1.00 1.00 $2,500.00 Grub stumps;complete Lump 2912 as specified Sum 1.00 1.00 $10,000.00 General excavation; Lump 2930 complete as specified Sum 1.00 1.00 $1,500,000.00 Excavation below subgrade-detention basin;complete as Cubic 2931 specified Yards 8,000.00 0.00 -8,000.00 $0.01 ($80.00) Import clay material; Cubic 2932 complete as specified Yards 5,000.00 0.00 -5,000.00 $8.00 ($40,000.00) Construct clay liner; Lump 2934 complete as specified Sum 1.00 1.00 $195,000.00 Furnish and install geocomposite drainage layer;complete as Square 2941 specified Yards 50,505.00 50,415.00 -90.00 $5.00 ($450.00) Furnish and install 8" backflow preventer; 2943 complete as specified Each 2.00 2.00 $1,400.00 Furnish and install 12" backflow preventer; 2945 complete as specified Each 1.00 1.00 $2,150.00 Furnish;install; maintain; and remove HOPE safety fencing;complete as Linear 2946 specified Feet 3,098.00 1,683.00 -1,415.00 $4.60 ($6,509.00) Furnish and install 8" sanitary sewer(relay); Linear 3000 complete as specified Feet 10.00 8.50 -1.50 $228.00 ($342.00) Furnish and install 10" sanitary sewer(relay); Linear 3002 complete as specified Feet 10.00 0.00 -10.00 $253.00 ($2,530.00) Furnish and install 8" sanitary sewer(new); Linear 3030 complete as specified Feet 440.00 419.90 -20.10 $102.00 ($2,050.20) Furnish and install standard sanitary sewer manhole(4'diameter); Vertical 3100 complete as specified Feet 255.00 253.65 -1.35 $310.00 ($418.50) Furnish and install external sanitary sewer manhole chimney seal; 3114 complete as specified Each 4.00 3.00 -1.00 $385.00 ($385.00) Page 6 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8"x 6" sanitary sewer factory wyes or tees;complete as 3210 specified Each 3.00 0.00 -3.00 $455.00 ($1,365.00) Furnish and install 10"x 6"sanitary sewer factory wyes or tees;complete as 3212 specified Each 2.00 0.00 -2.00 $556.00 ($1,112.00) Furnish and install4"16" sanitary sewer lateral (relay);complete as Linear 3234 specified Feet 150.00 0.00 -150.00 $70.00 ($10,500.00) Furnish and install sanitary sewer lateral marker balls;complete as 3236 specified Each 10.00 0.00 -10.00 $52.00 ($520.00) Furnish and install clay dams;complete as 3238 specified Each 5.00 0.00 -5.00 $255.00 ($1,275.00) Furnish and install connection to existing 8" sanitary sewer mains; 3300 complete as specified Each 6.00 2.00 -4.00 $1,900.00 ($7,600.00) Furnish and install connection to existing 10" sanitary sewer mains; 3302 complete as specified Each 4.00 0.00 -4.00 $2,050.00 ($8,200.00) Core into existing manhole;complete as 3332 specified Each 1.00 1.00 $3,150.00 Crack and damage survey;complete as 3650 specified Each 21.00 16.00 -5.00 $1,500.00 ($7,500.00) Abandon sanitary sewer manholes;complete as 3800 specified Each 1.00 1.00 $675.00 Abandon 6"sanitary sewer;complete as Linear 3801 specified Feet 50.00 0.00 -50.00 $17.00 ($850.00) Abandon 8"sanitary sewer;complete as Linear 3802 specified Feet 430.00 370.80 -59.20 $11.00 ($651.20) Remove sanitary sewer; Linear 3854 complete as specified Feet 300.00 28.40 -271.60 $6.00 ($1,629.60) Furnish and install 8" ductile iron water main (relay)with polywrap; Linear 4004 complete as specified Feet 50.00 70.00 20.00 5350.00 $7,000.00 Furnish and install 10" ductile iron water main (relay)with polywrap; Linear 4006 complete as specified Feet 150.00 154.00 4.00 $275.00 $1,100.00 Furnish and install 12" ductile iron water main (relay)with polywrap; Linear 4008 complete as specified Feet 40.00 62.00 22.00 $285.00 $6,270.00 Furnish and install 1" water service(relay); Linear 4036 complete as specified Feet 53.00 0.00 -53.00 $86.00 ($4,558.00) Furnish and install 1" corporation and stop box; 4048 complete as specified Each 5.00 7.00 2.00 $975.00 $1,950.00 Page 7 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNITCONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install connections to existing 8" water main;complete as 4060 specified Each 4.00 2.00 -2.00 $3,550.00 ($7,100.00) Furnish and install connections to existing 10"water main;complete 4062 as specified Each 4.00 4.00 $3,850.00 Furnish and install connections to existing 12"water main;complete 4064 as specified Each 2.00 2.00 $4,550.00 Furnish and install 10"x 12"water main cross; 4197 complete as specified Each 1.00 1.00 $1,650.00 Furnish and install 8"45 degree water main bend; 4237 complete as specified Each 8.00 10.00 2.00 $325.00 $650.00 Furnish and install 10"45 degree water main bend; 4238 complete as specified Each 8.00 12.00 4.00 $450.00 $1,800.00 Furnish and install 12"45 degree water main bend; 4239 complete as specified Each 4.00 4.00 $760.00 Furnish and install 8" water main cap;complete 4255 as specified Each 1.00 0.00 -1.00 $2,400.00 ($2,400.00) Furnish and install 8" water main gate valve; 4402 complete as specified Each 1.00 0.00 -1.00 $2,050.00 ($2,050.00) Furnish and install 10" water main gate valve; 4403 complete as specified Each 4.00 4.00 $2,230.00 Furnish and install 12" water main gate valve; 4404 complete as specified Each 2.00 2.00 $2,775.00 Furnish and install 10"x 8"tapping valve and sleeve;complete as 4438 specified Each 2.00 2.00 $5,300.00 Furnish and install 24" water main casing pipe; Linear 4730 complete as specified Feet 8.00 10.00 2.00 $555.00 $1,110.00 SECTION (BID ITEMS 1100-4730)-SUBTOTAL: $74,564.25 ($325,080.95) NET DECREASE TO SECTION: ($250,516.70) ADDITIONAL WORK REQUIRED CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install additional traffic control for Packer/Main Street intersection;complete as Lump 1-1998 specified Sum 0.00 1.00 1.00 $3,675.00 $3,675.00 Liquidated damages for truck route infractions; 1-1999 complete as specified Each 0.00 2.00 2.00 ($250.00) (S500.00) Furnish and install 10" storm sewer; complete as Linear 1-2002 specified Feet 0.00 32.40 32.40 $73.50 $2,381.40 Page 8 of 9 CONTRACT 18-02 CHANGE ORDER#1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE/N DECREASE/N NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install standard storm sewer; manhole(6'diameter); Vertical 1-2203 complete as specified Feet 0.00 7.76 7.76 $656.25 $5,092.50 Furnish and intall Turf Reinforce Mat System; Square 1-2638 complete as specified Yards 0.00 843.20 843.20 $21.34 $17,993.89 Furnish and install temporary soil stabilization compound; Lump 1-2997 complete as specified Sum 0.00 1.00 1.00 $1,334.70 $1,334.70 Down time to expose existing lateral;complete Lump 1-2998 as specified Sum 0.00 1.00 1.00 $874.42 $874.42 Excavate/Remove/Isolate existing septic field encumbrances within Jackson Street easement;complete as Lump 1-2999 specified Sum 0.00 1.00 1.00 $8,137.00 $8,137,00 Furnish and install new 6" ductile iron water main with polywrap;complete Linear 1-4020 as specified Feet 0.00 15.50 15.50 $115.50 $1,790.25 Furnish and install connections to existing 6" water main;complete as 1-4058 specified Each 0.00 1.00 1.00 $2,625.00 $2,625.00 Furnish and install 8"22.5 degree water main bend; 1-4228 complete as specified Each 0.00 1.00 1.00 $325.00 $325.00 Furnish and install 10" 22.5 degree water main bend;complete as 1-4229 specified Each 0.00 3.00 3.00 $450.00 $1,350.00 Furnish and install 6"45- degree water main bend; 1-4236 complete as specified Each 0.00 2.00 2.00 $288.75 $577.50 Furnish and install 10" sleeve;complete as 1-4301 specified Each 0.00 3.00 3.00 $3,360.00 $10,080.00 Furnish and install 6" water main gate valve; 1-4401 complete as specified Each 0.00 1.00 1.00 $1,837.50 $1,837.50 Furnish and install hydrant;complete as 1-4500 specified Each 0.00 1.00 1.00 $4,305.00 $4,305.00 (BID ITEMS 1-1998 -1-4500)-SUBTOTAL: $61,879.16 $0.00 NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO SECTION: ($250,516.70) NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO CONTRACT: ($188,637.54) Page 9 of 9