Loading...
HomeMy WebLinkAbout0106692-Plumbing (water heater)OSHKOSH ON THE WATER .lob Address 911 W 6TH AVE Contractor RAPID SOFT LLC Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 1 Site Drain 0 Roof Drain 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner TROY M/SHANNON SCHOENING Category 411 - Residential-Water Heaters No 106692 Create Date 03/02/2004 Plan Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL GAS WTR HTR FOR SEARS Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $532.00 Plan Approval $0.00 Permit Fees $20.00 ~] Permit Voided Issued By Parcel Id # 0605380000 Date 03/02/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address P.O. BOX4052 APPLETON WI 54915 - 0052 Telephone Number 920-757-6432 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.