HomeMy WebLinkAbout0106654-Plumbing (water heater) � CITY OF OSHKOSH No �oss ,
J
OS�I�OSH PLUMBING PERMIT -APPLICATION AND RECORD �,�
•DN THE WATER ;. � �!
Job Address 2211 GOLDEN AVE Owner DAVID S WOODLAND Create Date 02/�0��`
Contractor WATTERS PLUMBING Category 411 -Residential-Water Heaters Plan
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Res.Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Water Heater 1 Sump Pump 0 Dent.Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature FR/GAS WATER HEATER
of Work
Size Material Type # Conn.Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
� Parcel Id#
� 0618020000
Valuation $599.00 Plan Approval $0.00 Permit Fees $20.00 ❑ Permit Voided I
Issued By ,�L�Q Date 02/27/2004
In the performance of this work,I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address PO BOX 118 MENASHA WI 54952 -0118 Tetephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.