Loading...
HomeMy WebLinkAbout0106599-BuildingOSHKOSH ON THE WATER .lob .Address 100 STONEY BEACH RD Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner KENNETH M VISTE JR Contractor DAVID J ANDERSON Category 140 - Interior Remodeling No 106599 Create Date 02/25/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodel kitchen to include removal of 2 closets, removing dropped ceiling and install a new dropped ceiling with drywall, remove wall of Work between kitchen and butlers pantry (any loads will need to be transferred to the foundation, replace cabinets. HVAC Contractor Electric Contractor Fees: Valuation Issued By: MY ELECTRIC CORP. Plumbing Contractor M P KELLY $40,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $184.00 Park Dedication $0.00 Date 02/25/2004 Final/O.P. 00/00/0000 Parcel Id # 1414710000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 4697 ULMAN ST OSHKOSH WI 54904 - 0000 Telephone Number 233-1440 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.