HomeMy WebLinkAbout0106643-BuildingOSHKOSH
ON THE WATER
.lob.Address 233 N CAMPBELL RD
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH SEWAGE PLANT
Contractor SELMER COMPANY
Category 260 - City of Oshkosh-New
No 106643
Create Date 02/27/2004
Plan K5-12-0204
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: 3Bibc Size 45x92.66
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 4200 Sq. Ft. Bedrooms 0 Stories 1 Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 1
Use/Nature Wastewater Treatment Plant/ Install a 45x92.66, 4200 sf building to house emergency generators.
of Work
HVAC Contractor PACE CORP
Electric Contractor VAN ERT ELECTRIC
Fees: Valuation $1,200,000.00 Plan Approval
Issued By:
Plumbing Contractor PACE CORP
$0.00 Permit Fee Paid
Permit Voided
$0.00 Park Dedication $0.00
Date 02/27/2004 Final/O.P. 00/00/0000
Parcel Id # 0609680000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 11415 GREEN BAY WI 54307 - 1415 Telephone Number 920-434-0230
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION:
PROPERTY OWNER/CONTRACTOR:
ZONING
CONSTRUCTION DATA:
New Construction
: TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
COMPLIANCE CHECKLIST
Addition
Alteration
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
. Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
/~ APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEVVED BY: /~"~~.~._ __