Loading...
HomeMy WebLinkAbout0106643-BuildingOSHKOSH ON THE WATER .lob.Address 233 N CAMPBELL RD Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH SEWAGE PLANT Contractor SELMER COMPANY Category 260 - City of Oshkosh-New No 106643 Create Date 02/27/2004 Plan K5-12-0204 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: 3Bibc Size 45x92.66 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 4200 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature Wastewater Treatment Plant/ Install a 45x92.66, 4200 sf building to house emergency generators. of Work HVAC Contractor PACE CORP Electric Contractor VAN ERT ELECTRIC Fees: Valuation $1,200,000.00 Plan Approval Issued By: Plumbing Contractor PACE CORP $0.00 Permit Fee Paid Permit Voided $0.00 Park Dedication $0.00 Date 02/27/2004 Final/O.P. 00/00/0000 Parcel Id # 0609680000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 11415 GREEN BAY WI 54307 - 1415 Telephone Number 920-434-0230 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: PROPERTY OWNER/CONTRACTOR: ZONING CONSTRUCTION DATA: New Construction : TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST Addition Alteration DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard . Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. /~ APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEVVED BY: /~"~~.~._ __