HomeMy WebLinkAbout0106555-Building (roof & kitchen cabinets) CITY OF OSHKOSH No 106555
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER cD
Job Address 1924 MONTANA ST Owner ALICE PRICE Create Date 02/23/2'004
Designer Contractor OWNER
Category 141 - Exterior Remodeling Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection
Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR/ LATE PERMIT/ Re- roofed the house due to the wind storm and installation of new kitchen countertops.
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00
IJ
Issued By: OAP— - Date 02/23/2004 Final /O.P. 00 /00 /0000
❑ Permit Voided I Parcel Id # 1406850000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before staftin such activity.
�l
Signature /�aildrid / /e MM/ Date — c ° 1 -U/
Agent/Owner
Address 1924 MONTANA ST OSHKOSH WI 54902 - 7024 Telephone Number
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.