Loading...
HomeMy WebLinkAbout0106358-BuildingOSHKOSH ON THE WATER .lob ,Address 2541 W 20TH AVE Designer Triad Engineering CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CO OSHKOSH PEPSI COLA BOTTLING Contractor MIRON CONSTRUCTION CO INC Category 210 - Addition Industrial No 106358 Create Date 02/06/2004 Plan K2-005-0104 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: 2B Size 10800 sq ft Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection I Finished/Living 10800 Sq. Ft. Bedrooms 0 Stories 1 Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature IND/10800 sqaure foot addition for water treatment room expansion per State of Wisconsin Transaction ID # 957113. of Work HVAC Contractor UNKNOWN??? Electric Contractor UNKNOWN???? Fees: Valuation $82,400.00 Plan Approval Issued By: Plumbing Contractor UNKNOWN $0.00 Permit Fee Paid Permit Voided $313.00 Park Dedication $0.00 Date 02/09/2004 Final/O.P. 00/00/0000 Parcel Id # 1328580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 509 NEENAH WI 54957 - 0509 Telephone Number 920-969-7053 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 2541 W. 20th Ave., Pepsi Americas ZONING: M-3 PROPERTY OWNER/CONTRACTOR: Miron Construction CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 10800 sq.ft, addition for water treatment, FOUNDATION ONLY COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT [] Use [] Lot Width [] Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard Front Yard Side Street [] Rear Yard [] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting COMMENTS: Chamco Apprval per Penny Wilz, verbal, 02/06/2004 For above grade, please provide: 1. Detail drawings as to how any rooftop or gronnd-level mechanical equipmem will be screened from view of any street or residential zoning district (across W. 20th Avenue, propert3~ to the west of Pepsi Americas, and dwellings to the west.). 2. Provide our office with a landscape plan showing the location of the landscape trees and sbaubs that will be displaced by the const~action of the proposed addition. REVIEW AUTHORITY As per Section 30-5 Enfomement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. ]APPROVED [] DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: Matt Tucker DATE: 02~09~2004 2003