HomeMy WebLinkAbout0106481 B
No106481
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address2331 2335 PATRIOT LNOwnerCreate Date02/11/2004
DesignerContractorMIDWEST HOMES OF WI
Category121 - Duplex AdditionPlanD1-028-0202R
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitNot RequiredFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
Duplex / Alterations to permit # 93318. A different duplex was constructed on this lot than what the original permit was issued for. A new plan
Use/Nature
has been submitted.
of Work
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$64,000.00Plan Approval$75.00Permit Fee Paid$256.00Park Dedication$0.00
02/16/200400/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
100 N WESTHAVENOshkoshWI549040000426-2045
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
OSHKOSH
ON THE WATER
.lob.Address 2331 2335 PATRIOT LN
Designer
Category 111 - Single Family Addition
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner
Contractor MIDWEST HOMES OF WI
No 106481
Create Date 02/11/2004
Plan D1-028-0202R
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature NSFR/Alterations to permit # 93318. A different duplex was constructed on this lot than what the original permit was issued for. A new plan
of Work has been submitted.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$64,000.00 Plan Approval $75.00 Permit Fee Paid
Permit Voided
$256.00 Park Dedication $0.00
Date 02/16/2004 Final/O.P. 00/00/0000
Parcel Id #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 100 N WESTHAVEN Oshkosh WI 54904 - 0000 Telephone Number 426-2045
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.