HomeMy WebLinkAbout0106444-BuildingOSHKOSH
ON THE WATER
.lob.Address 701 MERRITTAVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner D & M RENTALS LLC
Contractor OWNER
Category 141 - Exterior Remodeling
No 106444
Create Date 02/12/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 2 Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Tavern & 2 Apartments/Replace all windows on second floor and first floor. Replace dwelling unit entrance doors, remodel bathroom in 701A,
of Work new kitchen in 701A, misc. repairs throughout building.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$25,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$139.00 Park Dedication $0.00
Date 02/12/2004 Final/O.P. 00/00/0000
Parcel Id # 1100200000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 55 KNAPP ST
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
COMMON PARCEL F
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.