Loading...
HomeMy WebLinkAbout0106393-Building (alterations)OSHKOSH ON THE WATER .lob Address 164 W 28TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH BGOSH INC Contractor UTSCHIG-ZIEGLER CONST CO INC Category 211 - Alteration Industrial No 106393 Create Date 02/10/2004 Plan K3-006-0204 Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size no change Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Factory/Miscellaneous alterations to for new tenant. Install misc. partition walls to separate various process areas, install misc. overhead and of Work passage doors. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $15,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $99.00 Park Dedication $0.00 Date 02/10/2004 Final/O.P. 00/00/0000 Parcel Id # 1412570000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N1040 CRAFTSMEN DR GREENVILLE WI 54942 - 0000 Telephone Number 920-757-1011 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.