HomeMy WebLinkAbout0106433 BOSHKOSH
ON THE WATER
.lob Address 338 PEARL AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TODD B/MARY J MURKEN
Contractor GRAPHIC HOUSE INC
Category 254 - Signs
No 106433
Create Date 02/06/2004
Plan
Type
Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Poured Concrete
Concrete Block
Occupancy Permit
Park Dedication
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
~J Projection I
Canopies 0
Signs 0
Use/Nature Office/Signage-Replace ilium, sign cabinets on ground signs, new 4'x6' cabinet for SW ground sign and 27"x36" cabinet for NE ground sign.
of Work Replace wall signs at SW corner of building with 3x8 illuminated cabinet signs. Replace "Murken" letters on west
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
WITZKE ELECTRIC INC
Plumbing Contractor
$9,500.00 Plan Approval $25.00 Permit Fee Paid
Permit Voided
$74.00 Park Dedication $0.00
Date 02/12/2004 Final/O.P. 00/00/0000
Parcel Id # 0101570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 9204 PACKER DR WAUSAU WI 54401 - 0000 Telephone Number
715-842-0402
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.