HomeMy WebLinkAbout0106391-PlumbingOSHKOSH
ON THE WATER
.lob Address 185 FARMSTEAD LN
Contractor P&S PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner US LAND DEVELOPMENT LLC
Category 410 - Residential-Interior
No 106391
Create Date 08/07/2003
Plan
Bathtub 3 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 1 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 3 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 3 Lndry Stndp 1 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Res. Sink 1 Disposal 1 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 1 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
Water Heater 1 Sump Pump 1 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 1
Use/Nature NSFR/
of Work
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $7,500.00 Plan Approval $0.00 Permit Fees $119.00 ~ Permit Voided
Issued By
Parcel Id #
0000000000
Date 02/10/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 2153 APPLETON WI 54912 - 2153 Telephone Number
920-722-5035, 920-7:
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.