HomeMy WebLinkAbout0106251 BOSHKOSH
ON THE WATER
.lob.Address 1229 SCHOOL AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL H KRIZ
Contractor OWNER
Category 141 - Exterior Remodeling
No 106251
Create Date 01/30/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
SFR/ Correcting violations noted on correction notice, including: replacing all windows (18), 2 exterior doors, framing in a door betweet the
lower laundry area and the common area stairs to 2nd floor, replace handrail and provide intermediate rails for basement stairs and replace/
install handrail on exterior steps.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$5,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$44.00 Park Dedication $0.00
Date 01/30/2004 Final/O.P. 00/00/0000
Parcel Id # 0204580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 247 A W SOUTH PARKAVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.