Loading...
HomeMy WebLinkAbout0106199 BOSHKOSH ON THE WATER .lob .Address 2010 MINERVA ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner STANLEY P SCHULTZ ETAL Contractor VAN HANDEL EXCAVATING INC Category 161 - Wrecking Residential Dwellings No 106199 Create Date 01/27/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence O Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Razing the exisitng single family dwelling. The site shall be free from debris, made level and brought to a dust free surface. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,600.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 01/27/2004 Final/O.P. 00/00/0000 Parcel Id # 1213220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5325 N BALLARD RD APPLETON WI 54915 - 0000 Telephone Number 730-9000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.