HomeMy WebLinkAbout0106199 BOSHKOSH
ON THE WATER
.lob .Address 2010 MINERVA ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner STANLEY P SCHULTZ ETAL
Contractor VAN HANDEL EXCAVATING INC
Category 161 - Wrecking Residential Dwellings
No 106199
Create Date 01/27/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence O Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Razing the exisitng single family dwelling. The site shall be free from debris, made level and brought to a dust free surface.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,600.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$32.00 Park Dedication $0.00
Date 01/27/2004 Final/O.P. 00/00/0000
Parcel Id # 1213220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5325 N BALLARD RD APPLETON WI 54915 - 0000 Telephone Number 730-9000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.