Loading...
HomeMy WebLinkAbout0106229-Building (concrete slab)OSHKOSH ON THE WATER .lob Address 548 GRAND ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WALTER SUNDQUIST Contractor M W CONSTRUCTION Category 142 - Decks, Patios, Ramps No 106229 Create Date 10/21/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/LATE PERMIT/Installation of a concrete slab in front of the house for a handicap lift. The lift is required to be removed when it is no of Work longer needed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $750.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 01/29/2004 Final/O.P. 00/00/0000 Parcel Id # 0000000000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2866 COLLEEN CT OSHKOSH WI 54904 - 7626 Telephone Number 920-232-8501 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.