HomeMy WebLinkAbout2004-Building (conversion) CITY OF OSHKOSH No 106246
Vic .,' - `
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER 42004
Job Address 680 W 3RD AVE Owner DAVID R HANSEN Create Date 01 /30 /20kLAT
Designer Contractor OWNER
Category 211 - Alteration Industrial Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection
Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation 0 Poured Concrete 0 Floating Slab 0 Pier • Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature Machine shop/ Install metal ceiling panels and insulate attic to convert this area from cold storage warehouse status to heated /production
of Work area status.
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuatio $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00
Issued By: Date 01/30/2004 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 0603810000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 55 KNAPP ST OSHKOSH WI 54902 - 3448 Telephone Number
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.