Loading...
HomeMy WebLinkAbout2004-Building (conversion) CITY OF OSHKOSH No 106246 Vic .,' - ` OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER 42004 Job Address 680 W 3RD AVE Owner DAVID R HANSEN Create Date 01 /30 /20kLAT Designer Contractor OWNER Category 211 - Alteration Industrial Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Pier • Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature Machine shop/ Install metal ceiling panels and insulate attic to convert this area from cold storage warehouse status to heated /production of Work area status. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 01/30/2004 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 0603810000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 - 3448 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.