Loading...
HomeMy WebLinkAbout0106162-Building (kitchen/patio) � CITY OF OSHKOSH No 106162 ,�r., .�:.cr OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD � 42� ON THE WATER ��?� Job Address 1635 CHESTNUT ST Owner WENDY E BERTELSEN Create Date 01/23/2004 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy � Fence � Raze I Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection � Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood -- Occupancy Permit Flood Plain Height Permit Park Dedication #Dweliing Units 0 #Structures 0 Use/Nature 'SFR/ Replace cabinets and countertops in the kitchen,replace 9 windows,patio door and 2 exterior doors. - � of Work I i � � I� �I � � � ---- ---- --_�, ---_____ _---- ______._--- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 01/23/2004 Final/O.P. 00/00/0000 � Permit Voided I Parcel Id# 1512480000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permi application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to se r any nece pro s bef re starting such activity. Signature � Date X I � Agent/Owner Address 1635 CHESTNUT ST OSHKOSH WI 54901 -2501 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. :