Loading...
HomeMy WebLinkAbout13. 19-480 AUGUST 27, 2019 19-480 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 19-11 TO WOOD SEWER & EXCAVATING, INC. FOR SANITARY MANHOLE REHABILITATION / INFLOW/INFILTRATION REDUCTION PROGRAM ($294,427.30) INITIATED BY: PUBLIC WORKS DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: WOOD SEWER & EXCAVATING, INC. E9238 County Road X New London, WI 54961 Total Bid: $294,427.30 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0315-0410-7480-00000 Street Improvement Fund Expenditures 0321-0410-6801-04911 Contract Control Fund - Streets 0321-0410-6802-04911 Contract Control Fund - Sanitary Sewer City of W Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: August 22, 2019 RE: Award Bid for Public Works Contract No. 19-11 Sanitary Manhole Rehabilitation/ Inflow/Infiltration Reduction Program Wood Sewer& Excavating, Inc. / ($294,427.30) BACKGROUND The purpose of this project is to repair and upgrade existing sanitary sewer manholes to reduce the amount of inflow and infiltration entering the sanitary sewer system. Engineering staff have previously inspected sanitary manholes to identify any defects. This contract will perform necessary repairs to approximately 75 of the approximately 5,800 public sanitary sewer manholes. This work will begin in the fall of 2019 and be completed by the spring of 2020. Upon completion of this project, approximately 1,600 manholes will have been rehabilitated since 2010. ANALYSIS Engineering staff reviewed two (2) bids. The low bid was received from Wood Sewer & Excavating, Inc. of New London, Wisconsin. The total bid is$294,427.30. 1:\Engineering\2019 CONTRACTS\19-11 San MH Page 1 of 2 Rehab\Project Information\Correspondence\Memo\19-11 Memo for Bid Award_8-22-19.docx FISCAL IMPACT Funding for this project is in the 2019 Capital Improvement Program (CIP). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. This contract only uses a portion of the allocated funds in the CIP. Other projects are also funded from this source, including emergency sanitary sewer repairs. Estimated Total Construction CIP Section CIP Funds Budgeted Cost Street *$15,000 $7,168 Sanitary Sewer $1,260,000 $323,591 Totals $1,275,000 $330,759 Note: The budget lines item denoted with an asterisk(*)include budget transfers from other projects. The Streets CIP includes a$15,000 transfer from the 2019 Concrete Pavement Repairs project. RECOMMENDATIONS I recommend award to the low bidder, Wood Sewer & Excavating, Inc. in the amount of $294,427.30. Approved: Mark A. Rohloff City Manager IC/tit I:\Engineering\2019 CONTRACTS\19-11 San MH Page 2 of 2 Rehab\Project_Information\Correspondence\Memo\19.11 Memo for Bid Award_8-22-19.docx Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program(:6457281) Owner:Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 08/19/2019 10:00 AM CDT Wood Sewer&Excavating,Inc. Vinton Construction Company E9238 County Road X New London,WI 54961 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $294,427.30 $333,348.30 Replace sanitary manhole ' casting(CITY to furnish casting);complete as 100 specified Each 60.011 53811.00 $22,800.00 $150.00 $9,000.00 Furnish and install 10" internal manhole chimney seal extension;complete 102 as specified Each 1.00 5620.10 $620.00 $300.00 $300.00 Furnish and install T internal manhole chimney seal extension;complete 104 as specified E arh 1.00 $20100 $200.00 $300.00 $300.00 Re-form/re-shape manhole bench;complete 106 as specified Each 1.00 $300.00 $31111.00 $790.00 $790.00 Furnish and install concrete adjusting rings; 108 complete as specified Vertical Feet 19.61 $380.00 $7,4 51.80 $250.00 $4,902.50 Furnish and install rubber adjusting rings;complete 110 as specified Vertical Feet 2.08 $700.00 51,456.011 $800.00 $1,664.00 Reconstruct sanitary sewer manhole(slurry); 112 complete as specified Vertical Feet 43.25 $680.00 $29,410 0)1 $570.00 $41,952.50 Furnish and install standard sanitary manhole(slurry)(4' diameter);complete as 114 specified Vertical Feet 39.40 $880.00 $34,672.00 $1,230.00 $48,462.00 Remove and replace I-IMA pavement; including sawing,fine grading,turf restoration; and traffic control; 116 complete as specified Square Yards 440.00 $59.00 $25,960.00 $75.00 $33,000.00 Tuck point manhole; 118 complete as specified Each 14.00 $200.01) $2,800.00 $150.00 $2,100.00 - Furnish and install cold mix patch;complete as 120 specified Square Yards 580.00 $9.00 $5,220.00 $0.01 $5.80 Page 1 01 8/19/2019 Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program I:6457281) Owner Oshkosh WI,City of Solicitor Oshkosh WI,City of Bid Opening: 08/19/201910:00 AM CDT Wood Sewer&Excavating,Inc. Vinton Construction Company E9238 County Road X New London,WI 54961 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Mobilization;complete as 1050 specified Lump Sum 1.00 $33,900.00 $33,900.00 $76,350.00 $76,350.00 Removing concrete and asphalt sidewalk and driveway;complete as 1120 specified Square Feet 325.00 $3.0(1 $975.00 $1.50 $487.50 concrete pavement ' removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1308 complete as specified Square Yards 3311011 $108.110 $35,640.00 $59 62 $19,674.60 concrete pavement tits removal and replacement, including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1309 complete as specified Square Yards 80.00 $80.00 $6,400.00 $63.00 $5,040.00 R concrete pavement removal and replacement, including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1318 complete as specified Square Yards 25.1)0 $73.00 $1,825.00 $63.00 $1,575.00 11 concrete pavement tits removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading turf restoration; and traffic control; 1319 complete as specified Square'Yards 25.00 $76.00 $1,900.11(I $67.00 $1,675.00 I R s rI,cotcrncmn911,MM MAW,rt cw„rm.trantc,.Nr.a WI,w.II eri.b..I)! Page 2ot4 8/19/2019 Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/infiltration Reduction Program 0,6457281) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of • Bid Opening: 08/19/2019 10:00 AM CDT Wood Serve'&Excavating,Inc Vinton Construction Company E9238 County Road X New London,WI 54961 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Turf restoration;complete 1370 as specified Square Yards _ 130.00 $12.00 $1,560.00 $12 00 51,560.00 Cold weather covering (concrete pavement)- single visquine;complete 1380 as specified Square Yards 230.00 Si)10 523.00 $0.01 52.30 Cold weather covering (concrete pavement)- double visquine;complete 1382 as specified Square Yards 230 0) 5U.I; $3450 $0.01 $2.30 Up-charge for late season cold weather concrete pavement;complete as 1390 specified Cubic Yards 230.00 $100 001 $23,000.00 $0.01 $2.30 s0 concrete curt,.ma gutter removal and replacement;including sawing;pavement ties; dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1448 complete as specified Linear Feet 20.00 560.00 $1,200.00 $50.00 $1,000.00 4"concrete sidewalk with 3"CABC and grading; 1500 complete as specified Square Feet 100.00 S8.00 $800.00 $10.00 $1,0000 tk) 6"concrete sidewalk/ driveway/ramp with 3" CABC and grading; 1510 complete as specified Square Feet 325.00 $10 00 $3,250.00 $10.00 $3,250 00 Curb ramp detectable warning field (natural/non-painted); 15411 complete as specified Square Feet 10.18) $60.0)1 $600.I0) $40.00 $400.00 Furnish;install;maintain; and remove 12"diameter sediment logs;complete 2518 as specified Linear Feet 60.00 $6.00 $360.01) $10.00 $600.00 Furnish and install external sanitary sewer manhole chimney seal; 3114 complete as specified Each 59.00 5680.00 S40,120.00 $1,140.00 567,260.00 11lnpy.nK%WI9CON7Aw(1S\19-11 5.n Mn WA.!\,.n_W.mu.onlcmu.n CS'1.119 1s e.1,.19 Page lot 4 $7v:21!I4 Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program 06457281) Owner:Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 08/19/2019 10:00 AM CDT Wood Sewer&Excavating,Inc Vinton Construction Company E9238 County Road X New London,WI 54961 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install external sanitary sewer manhole chimney seal extension;complete as 3116 specified Each 10.(X) $230.00 $2,300.(X) $250.(X) 82510UX) Furnish and install internal sanitary sewer manhole chimney seal; 3118 complete as specified Each 6.00 $500.00 $3,000.00 $450.00 $2,700.00 Excavation special (sanitary);complete as 3892 specified Ton, 20.00 $10.00 $200.00 $20.00 $400.00 Furnish sanitary sewer manhole grouting setup; 3974 complete as specified Each 5.00 $725.00 $3,625.00 $725.00 $3,625.00 Furnish and install sanitary sewer manhole grouting;complete as 3975 specified Gallons 75.00 $3.00 $225.00 $2.50 $18750 Furnish sanitary sewer manhole cementitious liner setup;complete as 3976 specified Each 2.00 $600.00 $1,200.00 $200.00 $400.00 Furnish and install sanitary sewer structural cementitious liner- PERMACAST by AP/M PERMAFORM;complete 3977 as specified Vertical Feet 10.00 S140.00 $1,400.00 S118.00 $1,180.00 Bid Total: $294,427.30 $333,348.30 , rey,X119ca..,..sr,s,,,•,,s.nMNx,ab,r,,. ,,...,,.,<,.,,,.,,,,b,,,,sale::,,, Pap.4:14 5119a019