HomeMy WebLinkAbout13. 19-480 AUGUST 27, 2019 19-480 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 19-11 TO
WOOD SEWER & EXCAVATING, INC. FOR SANITARY
MANHOLE REHABILITATION / INFLOW/INFILTRATION
REDUCTION PROGRAM ($294,427.30)
INITIATED BY: PUBLIC WORKS DIVISION
WHEREAS, the City of Oshkosh has heretofore advertised for bids for Sanitary
Manhole Rehabilitation/Inflow/Infiltration Reduction Program; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
WOOD SEWER & EXCAVATING, INC.
E9238 County Road X
New London, WI 54961
Total Bid: $294,427.30
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 0315-0410-7480-00000 Street Improvement Fund Expenditures
0321-0410-6801-04911 Contract Control Fund - Streets
0321-0410-6802-04911 Contract Control Fund - Sanitary Sewer
City
of W
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager/City Engineer
DATE: August 22, 2019
RE: Award Bid for Public Works Contract No. 19-11
Sanitary Manhole Rehabilitation/
Inflow/Infiltration Reduction Program
Wood Sewer& Excavating, Inc. / ($294,427.30)
BACKGROUND
The purpose of this project is to repair and upgrade existing sanitary sewer manholes to
reduce the amount of inflow and infiltration entering the sanitary sewer system.
Engineering staff have previously inspected sanitary manholes to identify any defects.
This contract will perform necessary repairs to approximately 75 of the approximately
5,800 public sanitary sewer manholes. This work will begin in the fall of 2019 and be
completed by the spring of 2020. Upon completion of this project, approximately 1,600
manholes will have been rehabilitated since 2010.
ANALYSIS
Engineering staff reviewed two (2) bids. The low bid was received from Wood Sewer &
Excavating, Inc. of New London, Wisconsin. The total bid is$294,427.30.
1:\Engineering\2019 CONTRACTS\19-11 San MH Page 1 of 2
Rehab\Project Information\Correspondence\Memo\19-11 Memo for Bid Award_8-22-19.docx
FISCAL IMPACT
Funding for this project is in the 2019 Capital Improvement Program (CIP). Following is
a summary of the available funds and the estimated total construction cost, including
ancillary costs such as engineering fees, landfill tipping fees, construction materials
testing fees, and other construction-related expenses. This contract only uses a portion
of the allocated funds in the CIP. Other projects are also funded from this source,
including emergency sanitary sewer repairs.
Estimated Total Construction
CIP Section CIP Funds Budgeted Cost
Street *$15,000 $7,168
Sanitary Sewer $1,260,000 $323,591
Totals $1,275,000 $330,759
Note: The budget lines item denoted with an asterisk(*)include budget transfers from other projects. The Streets CIP
includes a$15,000 transfer from the 2019 Concrete Pavement Repairs project.
RECOMMENDATIONS
I recommend award to the low bidder, Wood Sewer & Excavating, Inc. in the amount of
$294,427.30.
Approved:
Mark A. Rohloff
City Manager
IC/tit
I:\Engineering\2019 CONTRACTS\19-11 San MH Page 2 of 2
Rehab\Project_Information\Correspondence\Memo\19.11 Memo for Bid Award_8-22-19.docx
Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program(:6457281)
Owner:Oshkosh WI,City of
Solicitor.Oshkosh WI,City of
Bid Opening: 08/19/2019 10:00 AM CDT
Wood Sewer&Excavating,Inc. Vinton Construction Company
E9238 County Road X
New London,WI 54961
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Section 1: Base Bid $294,427.30 $333,348.30
Replace sanitary manhole '
casting(CITY to furnish
casting);complete as
100 specified Each 60.011 53811.00 $22,800.00 $150.00 $9,000.00
Furnish and install 10"
internal manhole chimney
seal extension;complete
102 as specified Each 1.00 5620.10 $620.00 $300.00 $300.00
Furnish and install T
internal manhole chimney
seal extension;complete
104 as specified E arh 1.00 $20100 $200.00 $300.00 $300.00
Re-form/re-shape
manhole bench;complete
106 as specified Each 1.00 $300.00 $31111.00 $790.00 $790.00
Furnish and install
concrete adjusting rings;
108 complete as specified Vertical Feet 19.61 $380.00 $7,4 51.80 $250.00 $4,902.50
Furnish and install rubber
adjusting rings;complete
110 as specified Vertical Feet 2.08 $700.00 51,456.011 $800.00 $1,664.00
Reconstruct sanitary
sewer manhole(slurry);
112 complete as specified Vertical Feet 43.25 $680.00 $29,410 0)1 $570.00 $41,952.50
Furnish and install
standard sanitary
manhole(slurry)(4'
diameter);complete as
114 specified Vertical Feet 39.40 $880.00 $34,672.00 $1,230.00 $48,462.00
Remove and replace
I-IMA pavement;
including sawing,fine
grading,turf restoration;
and traffic control;
116 complete as specified Square Yards 440.00 $59.00 $25,960.00 $75.00 $33,000.00
Tuck point manhole;
118 complete as specified Each 14.00 $200.01) $2,800.00 $150.00 $2,100.00
-
Furnish and install cold
mix patch;complete as
120 specified Square Yards 580.00 $9.00 $5,220.00 $0.01 $5.80
Page 1 01 8/19/2019
Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program I:6457281)
Owner Oshkosh WI,City of
Solicitor Oshkosh WI,City of
Bid Opening: 08/19/201910:00 AM CDT
Wood Sewer&Excavating,Inc. Vinton Construction Company
E9238 County Road X
New London,WI 54961
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Mobilization;complete as
1050 specified Lump Sum 1.00 $33,900.00 $33,900.00 $76,350.00 $76,350.00
Removing concrete and
asphalt sidewalk and
driveway;complete as
1120 specified Square Feet 325.00 $3.0(1 $975.00 $1.50 $487.50
concrete pavement '
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1308 complete as specified Square Yards 3311011 $108.110 $35,640.00 $59 62 $19,674.60
concrete pavement tits
removal and replacement,
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1309 complete as specified Square Yards 80.00 $80.00 $6,400.00 $63.00 $5,040.00
R concrete pavement
removal and replacement,
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1318 complete as specified Square Yards 25.1)0 $73.00 $1,825.00 $63.00 $1,575.00
11 concrete pavement tits
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading turf restoration;
and traffic control;
1319 complete as specified Square'Yards 25.00 $76.00 $1,900.11(I $67.00 $1,675.00
I R s rI,cotcrncmn911,MM MAW,rt cw„rm.trantc,.Nr.a WI,w.II eri.b..I)! Page 2ot4 8/19/2019
Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/infiltration Reduction Program 0,6457281)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
•
Bid Opening: 08/19/2019 10:00 AM CDT
Wood Serve'&Excavating,Inc Vinton Construction Company
E9238 County Road X
New London,WI 54961
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Turf restoration;complete
1370 as specified Square Yards _ 130.00 $12.00 $1,560.00 $12 00 51,560.00
Cold weather covering
(concrete pavement)-
single visquine;complete
1380 as specified Square Yards 230.00 Si)10 523.00 $0.01 52.30
Cold weather covering
(concrete pavement)-
double visquine;complete
1382 as specified Square Yards 230 0) 5U.I; $3450 $0.01 $2.30
Up-charge for late season
cold weather concrete
pavement;complete as
1390 specified Cubic Yards 230.00 $100 001 $23,000.00 $0.01 $2.30
s0 concrete curt,.ma
gutter removal and
replacement;including
sawing;pavement ties;
dowel bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1448 complete as specified Linear Feet 20.00 560.00 $1,200.00 $50.00 $1,000.00
4"concrete sidewalk with
3"CABC and grading;
1500 complete as specified Square Feet 100.00 S8.00 $800.00 $10.00 $1,0000 tk)
6"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
1510 complete as specified Square Feet 325.00 $10 00 $3,250.00 $10.00 $3,250 00
Curb ramp detectable
warning field
(natural/non-painted);
15411 complete as specified Square Feet 10.18) $60.0)1 $600.I0) $40.00 $400.00
Furnish;install;maintain;
and remove 12"diameter
sediment logs;complete
2518 as specified Linear Feet 60.00 $6.00 $360.01) $10.00 $600.00
Furnish and install
external sanitary sewer
manhole chimney seal;
3114 complete as specified Each 59.00 5680.00 S40,120.00 $1,140.00 567,260.00
11lnpy.nK%WI9CON7Aw(1S\19-11 5.n Mn WA.!\,.n_W.mu.onlcmu.n CS'1.119 1s e.1,.19 Page lot 4 $7v:21!I4
Contract 19-11-Sanitary Manhole Rehabilitation/Inflow/Infiltration Reduction Program 06457281)
Owner:Oshkosh WI,City of
Solicitor.Oshkosh WI,City of
Bid Opening: 08/19/2019 10:00 AM CDT
Wood Sewer&Excavating,Inc Vinton Construction Company
E9238 County Road X
New London,WI 54961
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Furnish and install
external sanitary sewer
manhole chimney seal
extension;complete as
3116 specified Each 10.(X) $230.00 $2,300.(X) $250.(X) 82510UX)
Furnish and install
internal sanitary sewer
manhole chimney seal;
3118 complete as specified Each 6.00 $500.00 $3,000.00 $450.00 $2,700.00
Excavation special
(sanitary);complete as
3892 specified Ton, 20.00 $10.00 $200.00 $20.00 $400.00
Furnish sanitary sewer
manhole grouting setup;
3974 complete as specified Each 5.00 $725.00 $3,625.00 $725.00 $3,625.00
Furnish and install
sanitary sewer manhole
grouting;complete as
3975 specified Gallons 75.00 $3.00 $225.00 $2.50 $18750
Furnish sanitary sewer
manhole cementitious
liner setup;complete as
3976 specified Each 2.00 $600.00 $1,200.00 $200.00 $400.00
Furnish and install
sanitary sewer structural
cementitious liner-
PERMACAST by AP/M
PERMAFORM;complete
3977 as specified Vertical Feet 10.00 S140.00 $1,400.00 S118.00 $1,180.00
Bid Total: $294,427.30 $333,348.30
, rey,X119ca..,..sr,s,,,•,,s.nMNx,ab,r,,. ,,...,,.,<,.,,,.,,,,b,,,,sale::,,, Pap.4:14 5119a019