Loading...
HomeMy WebLinkAbout201503416-Plumibing (water heater) � CITY OF OSHKOSH � Permit# 201503416 O.IHK01H P L U M B I N G P E R M I T �ssued Date 08/20/2015 _ ..QI�L7HEWATER _ . Job Address 217 W 11TH AVE Owner AUDREY I RHYNER Parcel ID 0901130000 Category Water Heater Contractor KOCH PLUMBING&HEATING INC Use Residential Business Description Replace Leaking Water Heater Permit Details Bathtub Clothes Washr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump F Prep Sink CCC Assembly Coffee Maker Wtr Usage Mtrs Lavatory San Sump/Pum FirlWst Sink Bidet Site Drain Misc.Fixtures Toilet Water Softner Hand Sink Urinal Wait.St. Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Mak Total Fixtures 1 Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Tra Floor Drain Bar Sink Serv Sink Wash Ftn Ext Grease Tra Hose Bib Breakrm Sink Shamp Sink Catch Basin Eye Wash Stat Water Heater 1 Fees Issued By ��� ��/� /�o Valuation $800.00 ��Iy r r,CG� Fees Plumbing Permit $30.00 $30.00 Jon Mueller Payment Account Pre-Pay Prepay Balance $125.00 Conditions In the performance of this work to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authoriry to enforce easement restrictions of which it is not a party, if you perForm the work described in this permit application within an easement,the City strongly urges the permit applicant to contract the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understood the aforementioned information. Applicati�n Si�ned Signature Date 08/20/2015 AgenUOwner Address 2005 DOTY ST OSHKOSH WI 54902 Telephone Number 920-231-6661 or 235-0282 Required Inspecfions: Final To schedule inspections please call the Inspection Request line at 920-236-5128 noting the Address,Permit Number,Type of Inspection(i.e.Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number.Unless specified otherwise,we will assume the project is ready at the time the request is received.Work may continue if the inspection is not performed within two business days from the time the project is ready.