Loading...
HomeMy WebLinkAbout0106104-Building (garage)OSHKOSH ON THE WATER .lob.Address 2614 HARRISON ST Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner CARL H O DUMDIE/DOROTHY J NIC Create Date Contractor OWNER 150 - New Accessory Buildings-Garages (Residential) Plan 106104 11/17/2003 Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Late Permit/ Vienola Bros.did the concrete work for the slab and the owner constructed the garage without 1st obtaining a permit. The of Work garage is 25' x 32' and the driveway is existing. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $10,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $120.00 Park Dedication $0.00 Date 01/19/2004 Final/O.P. 00/00/0000 Parcel Id # 1519510100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2614 HARRISON ST OSHKOSH WI 54901 - 1608 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.