HomeMy WebLinkAbout2004-Building (alterations)OSHKOSH
ON THE WATER
.lob.Address 639 WITZEL AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH CITY GARAGE
Contractor OWNER
Category 262 - City of Oshkosh-Alteration
No 106097
Create Date 01/16/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature City Garage/Alterations in vicinity of Break Room. Create new exit passage way through breakroom, close off door way from present locker
of Work room to garage, create a Map room.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$3,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$0.00 Park Dedication $0.00
Date 01/16/2004 Final/O.P. 00/00/0000
Parcel Id # 0603510100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address PO BOX 1130
Agent/Owner
OSHKOSH
WI 54903 - 1130 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.