Loading...
HomeMy WebLinkAbout2004-Building (alterations)OSHKOSH ON THE WATER .lob.Address 639 WITZEL AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH CITY GARAGE Contractor OWNER Category 262 - City of Oshkosh-Alteration No 106097 Create Date 01/16/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature City Garage/Alterations in vicinity of Break Room. Create new exit passage way through breakroom, close off door way from present locker of Work room to garage, create a Map room. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $3,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $0.00 Park Dedication $0.00 Date 01/16/2004 Final/O.P. 00/00/0000 Parcel Id # 0603510100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1130 Agent/Owner OSHKOSH WI 54903 - 1130 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.