HomeMy WebLinkAbout2003-Plumbing (interior)CITY OF OSHKOSH
106058
No
OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address3031 SAWYER CREEK DROwnerJEFFREY/LAURIE SCHUTTEYCreate Date10/06/2003
ContractorAHERN-GROSS INC.CategoryPlan
410 - Residential-Interior
Bathtub1Shower3Ejector/Grind0Dip Well0F Prep Sink0Gar Drain1
Whirlpool1Floor Drain1Water Softner0Drink Ftn0Serv Sink00
Soda Disp
Lavatory51Local Waste1Wait. St.0Shamp Sink00
Lndry TrayCoffee Maker
Toilet41Clothes Wshr1Ice Chest0Flr/Wst Sink0
0
Lndry Stndp
Int Grease Trap
Res. Sink11Bidet0Exam Sink0Catch Basin0
Disposal0
Ext Grease Trap
Bar Sink010Wash Ftn0
Beer Tap0Sculry Sink
Dishwasher
RPZ Valve0
Water Heater110Urinal0
Sump PumpDent. Oper.0Hand Sink
0
Eye Wash Statn
Site Drain100Standp Rec1
Classrm SinkLab Sink0Plaster Sink
Roof Drain000Ice Maker1
Breakrm SinkSterilizer0Surgeons Sink
Use/Nature NSFR/ 1 story home with a 3 car attached garage.
of Work
SizeMaterialType#Conn. Type
Sanitary Sewer0
0
0
0
0
Storm Sewer0
0
0
0
0
Water Service0
0
0
0
0
$0.00Permit Voided
Valuation$17,000.00Plan ApprovalPermit Fees$196.00
Issued ByDate01/14/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Agent/Owner
Address218 S MAIN STFOND DU LACWI54935-0000Telephone Number920-921-1414
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.