Loading...
HomeMy WebLinkAbout0106066-Building (siding)OSHKOSH ON THE WATER .lob Address 78 80 LAKE ST Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 106066 Owner JOHN P/SHARON K ENGEL Create Date 01/13/2004 PAUL DAVIS RESTORATION OF FOX VALLE Plan Contractor Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Duplex/Additional siding work for last permit(105958) Replace all siding. No structural work. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: CONCEPT ELECTRIC INC. Plumbing Contractor $9,000.00 Plan Approval $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Date 01/14/2004 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1555 S COMMERCIAL ST NEENAH WI 54956 - 4855 Telephone Number 920-729-1551 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.