Loading...
HomeMy WebLinkAbout0106010-Plumbing e OSHKOSH ON THE WATER Job Address 1220 FAIRFAX ST CITY OF OSHKOSH No 106010 PLUMBING PERMIT - APPLICATION AND RECORD Owner RUSCH HOMES LLC Plan Create Date 10/31/2003 Contractor HANSON QUALITY PLUMBING Category 410 - Residential-Interior Bathtub 1 Shower 2 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 - - - - - - Whirlpool 0 Floor Drain 1 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 3 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 - - - - - - Toilet 3 Lndry Stndp 1 Clothes Wshr 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0 - Res. Sink 1 Disposal 1 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 - - - - - - Bar Sink 0 Dishwasher 1 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 - - Water Heater 1 Sump Pump 1 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 - - - - - Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 - - - - - Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 1 Use/Nature NSFR/ 1 story home with a 2 car attached garage. of Work Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $119.00 U Permit Voided I Valuation $5,300.00 $0.00 Permit Fees Plan Approval Issued By Date 01/09/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner APPLETON 730-0205 WI 54914 - 0000 550 N BLUEMOUND RD Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.