HomeMy WebLinkAbout08. 19-447 AUGUST 13, 2019 19-447 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 19-22 TO VINTON CONSTRUCTION COMPANY FOR OSHKOSH AVENUE/NORTH KOELLER ROUNDABOUT MODIFICATIONS ($198,864.01) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Oshkosh Avenue/North Koeller roundabout modifications; and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY, INC. 2705 N. Rapids Road Manitowoc, WI 54220 Total Bid: $198,864.01 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0315-0410-7480-00000 Street Improvement Fund Expenditures 0321-0410-6801-04922 Contract Control Fund - Paving 0321-0410-6802-04922 Contract Control Fund - Sanitary Sewer City of W Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: August 8, 2019 RE: Award Bid for Public Works Contract No. 19-22 Oshkosh Avenue/North Koeller Roundabout Modifications Vinton Construction Company/($198,864.01) BACKGROUND The purpose of this project is to install a dedicated right-turn lane from southbound North Koeller Street onto westbound Oshkosh Avenue, as well as sidewalk along the new dedicated right-of- way of North Koeller Street. As a part of all of the development within the area and the agreement with Oshkosh Corporation for the construction of the Oshkosh Corporation World Headquarters, a Traffic Impact Analysis (TIA) was completed in 2018. This analysis recommended adding a dedicated right-turn lane from North Koeller Street onto Oshkosh Avenue, due to the traffic volumes leaving the area. ANALYSIS Engineering staff reviewed one(1)bid. The bid was received from Vinton Construction Company of Manitowoc, Wisconsin. The total bid is$198,864.01. FISCAL IMPACT Funding for the project is in the 2018 Capital Improvement Program (CIP). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. Estimated Total Construction CIP Section CIP Funds Budgeted Cost Street $220,000 $217,431 Sanitary Sewer $10,000 $9,047 Totals $230,000 $226,478 1:\Engineering\2019 CONTRACTS\19-22 Oshkosh Ave Page 1 of 2 Roundabout\Project_Information\Correspondence\Memo\19-22 Memo for Bid A ward_8-S-19.docx RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company in the amount of $198,864.01 App oved: Jo Fitzpatri Assistant City Manager JG/tlt I:\Engineering\2019 CONTRACTS\19-22 Oshkosh Ave Page 2 of 2 Roundabout\project_Information\Correspondence\Memo\19-22 Memo for Bid Award_B-B-19.docx Contract 19-22-Oshkosh Avenue/North Koeller Roundabout Modifications(#6447392) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 08/05/2019 10:00 AM CDT Vinton Construction Company PO Box 1987 Manitowoc,WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Section 1: Base Bid $198,864.01 Clearing;complete as 1(111 specified Inch Diameter 64.00 $30.00 $1,920.00 Grubbing;complete as 1021 specified Inch Diameter 64.00 $30.00 $1,920.00 Mobilization;complete as 10.50 specified Lump Sum 1.00 $38,500.00 $38,500.00 Removing pavement; 1100 complete as specified Square Yards 600.00 $9.10 $5,460.00 Removing concrete and asphalt sidewalk and driveway;complete as 1120 specified Square Feet 3,030.00 $0.85 i $2,575.50 ' Unclassified excavation; 1200 complete as specified Cubic Yards 200.00 $28.10 $5,620.00 9"concrete pavement doweled;HES;with 6" CABC and grading; 1325 complete as specified Square Yards 800.00 $79.63 $63,704.00 Crushed aggregate base course;complete as 1340 specified Tons 78.00 $17.50 $1,365.00 Pavement ties;complete 1350 as specified Each 115.00 $10.00 _ $1,150.00 Drilled dowel bars;1 1/4"; 1354 complete as specified Each 20.00 $14.00 $280.00 C:\esers\tracyt\AppData\Loral\Mwrosoft\Wlndowsl Temporary Internet Fries\Content.wEs\LFLt+B9FQ\BidWorksheet(.447392_Eval Page 1 of 5 s/5,2014 Contract 19-22-Oshkosh Avenue/North Koeller Roundabout Modifications(464473921 Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 08/05/2019 10:00 AM CDT Vinton Construction Company PO Box 1987 Manitowoc,WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Adjust manholes and inlets;complete as 1360 specified Each 2.00 $400.00 $800.00 Turf restoration;complete 1370 as specified Square Yards 610.00 $15.00 $9,150.00 18"curb and gutter;8"; with 6"CABC and grading;complete as 1422 specified Linear Feet 70.00 $40.00 $2,800.00 6"concrete sidewalk /driveway/ramp with 3" CABC and grading; 1510 complete as specified Square Feet 4,800.00 $7.50 $36,000.00 Salvage and re-use brick; 1528 complete as specified Square Feet 265.00 $19.00 $5,035.00 Curb ramp detectable warning field(natural/non- painted);complete as 1540 specified Square Feet 48.00 $35.00 $1,680.00 Drilled No.4 sidewalk tie bars-deformed;epoxy- coated;complete as 1560 specified Each 11.00 $10.00 $110.00 Sawing concrete pavement full depth; 1710 complete as specified Linear Feet 335.00 $4.50 $1,507.50 C User,\tracyt\AppData\Local\Microsoft\Windows\Temporary Internet Fde.\Content1E5\LFLaB9FQ\BidWarksheet 6447392_Eval Page 2 of 5 5/5/201' Contract 19-22-Oshkosh Avenue/North Koeller Roundabout Modifications(46447392) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 08/05/2019 10:00 AM CDT Vinton Construction Company PO Box 1987 Manitowoc,WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Pavement markings; epoxy;4"(white); 1974 complete as specified Linear Feet 138.00 $7.00 $966.00 Pavement markings; epoxy;4"(yellow); 1975 complete as specified Linear Feet 500.00 $7.00 $3,500.00 Pavement markings; arrow epoxy;Type 2 (white);complete as 1980 specified Each 1.00 $450.00 $450.00 Pavement markings; arrow epoxy;Type 3 (white);complete as 1981 specified Each 1.00 $450.00 $450.00 Pavement markings; epoxy;12"diagonal (yellow);complete as 1982 specified Linear Feet 11.00 $14.00 $154.00 Pavement markings;word epoxy;(white);complete 1983 as specified Each 3.00 $500.00 $1,500.00 Pavement markings; dotted extension;epoxy; 18';(white);complete as 1987 specified Linear Feet 85.00 $15.00 $1,275.00 Pavement markings;curb epoxy;(yellow);complete 1988 as specified Linear Feet 24.00 $13.00 $312.00 C\Uursl tracyt\AppData\Local\MIcrosoft\Wudows\Temporary Internet Files\Content.IES\LFL6B9FQ\BidWorksheet_6947392_Eval Page 3 of 5 8/5/2019 Contract 19-22-Oshkosh Avenue/North Koeller Roundabout Modifications(46447392) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 08/05/2019 10:00 AM CDT Vinton Construction Company PO Box 1987 Manitowoc,WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Pavement markings; epoxy;12"chevron (white);complete as 1990 specified Linear Feet 18.00 $14.00 $252.00 Pavement markings; epoxy;8"line grooved wet reflective contrast(white); 1991 complete as specified Linear Feet 120.00 $25.00 $3,000.00 Pavement markings; island nose epoxy (yellow);complete as 1992 specified Each 1.00 $300.00 $300.00 Furnish;install;maintain; and remove Type D modified inlet protection; 2508 complete as specified Each 5.00 $70.00 $350.00 Furnish;install;maintain; and remove stone tracking 2512 pad;complete as specified Each 1.00 $0.01 $0.01 Furnish;install;maintain; and remove stone bag; 2516 complete as specified Each 2.00 $20.00 $40.00 Furnish and install standard sanitary sewer manhole(4'diameter); 3100 complete as specified Vertical Feet 6.00 $1,023.00 $6,138.00 C\Users\tracyt\AppData\Local\Mt[Tnsntt\Window,\Temporary Internet',k\Content 1E5\LFL6B9FQ\BldWorkshect_M947392_EvI Page 4 of 5 8/5/201q Contract 19-22-Oshkosh Avenue/North Koeller Roundabout Modifications(#6447392) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 08/05/2019 10:00 AM CDT Vinton Construction Company PO Box 1987 Manitowoc,WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Furnish and install external sanitary sewer manhole chimney seal; 3114 complete as specified Each E00 $600.00 $600.00 Base Bid Total: $198,864.01 C\lasers\tracyt\AppData\Local\Microsoft\Window,1 Temporary Intern.Hato\Content 1E5\LFL6B9FQ\BidWorksheet6447392_Eval Page 5 of 5 8/5/201g