Loading...
HomeMy WebLinkAbout07. 19-446 AUGUST 13, 2019 19-446 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 18-16 TO AUGUST WINTER&SONS,INC.FOR WASTE WATER TREATMENT PLANT DIGESTER MIXING UPGRADE ($1,699,850.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for digester mixing upgrade for the Waste Water Treatment Plant; and WHEREAS, upon the opening and tabulation of bids, the following is the only bid: AUGUST WINTER & SONS, INC. 2323 N Roemer Rd Appleton, WI 54911 Total Bid: $1,699,850.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0322-1910-7206-05825 Property/Equipment Improvement Fund - Capital Construction fLO City f Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works/Utilities General Managers I DATE: August 8, 2019 RE: Award Bid for Public Works Contract No. 18-16 WWTP Digester Mixing Upgrade August Winter& Sons,Inc./($1,699,850) BACKGROUND The WWTP uses Anaerobic Digestion as part of the wastewater treatment process. This process was installed in 1994 as part of a plant upgrade project. A digester gas mixing system was originally installed with the project. Over time, that system has lost efficiency and requires high levels of maintenance and energy use to keep it in operation. This project will replace that system with a more efficient and maintenance-friendly mixing system. The Digester Mixing System Upgrade project was identified as a high-priority project in the wastewater system asset management plan completed in 2017. ANALYSIS Engineering staff reviewed one (1) bid. The bid was received from August Winter & Sons, Inc. of Appleton, Wisconsin. The total bid was $1,699,850. While only one (1) bid was received, it was within $5,000 of the Engineer's estimate for the project. FISCAL IMPACT Funding for this project is in the Major Equipment-Wastewater Utility section of the 2018 Capital Improvement Program (CIP). Additional agreements will be required with Donohue & Associates, Inc. and Jacobs for construction engineering and computer integration. The budgeted funding is$2,300,000. RECOMMENDATIONS I recommend award to the low bidder, August Winter& Sons, Inc. in the amount of$1,699,850. Ap• oved: Ilt Jo/ Fitzpatri Assistant City Manager I:\wastewater\18-16DigesterMixing Upgrade\Project_Information\Correspondence\Memo\18-16 Page 1 of 1 Memo for Bid Award 8-B-19.docx Contract 18-16 WWTP Digester Mixing Upgrade(#6312297) Owner:Oshkosh WI,City of I Solicitor:Donohue Sr Associates,Inc. Bid Opening: 08/05/2019 10:00 AM CDT August Winter&Sons,Inc PO Box 1896 Appleton,WI 54911 Section Title Item Code Item Description UofM Quantity Unit Price Extension Section 1: Base Bid $1,699,850.00 All work except for items #2 through#4;complete 100110 as specified Lump Sum 1.00 $1,504,850.00 $1,504,850.00 Digester cover reinforcement allowance; 1210 complete as specified Lump Sum 1.00 $35,000.00 $35,000.00 Removal,processing,and disposal of digester contents;complete as 2100 specified Dry Tons 200.00 $580.00 $116,000.00 Tuckpointing;complete 4900 as specified Square Feet 2,000.00 522.00 $44,000.00 Base Bid Total: $1,699,850.00 Pap,1„i 1 K/52019