Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Payne & Dolarn PW 19-10 Lakeshore Riverwalk
35491 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT(STIPULATED PRICE) THIS AGREEMENT is by and between City of Oshkosh ("Owner")and Payne& Dolan Inc., W 6380 Design Drive Greenville, WI 54942 ("Contractor"). Owner and Contractor hereby agree as follows: ARTICLE 1 —WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Construction of upland Riverwalk and associated features from east of Tribal Heritage Crossing trail (east side US Interstate 41)to Rainbow Park Trail (north terminus of Punhoqua Street)as shown on the Construction Drawings. ARTICLE 2—THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: City Contract 19-10 Lakeshore Riverwalk I-41 to Punhoqua Street Construction ARTICLE 3—ENGINEER 3.01 The Project has been designed by AECOM (Engineer),which is to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4—CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Dates for Substantial Completion and Final Payment A. The Work will be substantially completed including all work excluding the installation of the bridges on or before October 1, 2019, and completed and ready for final payment in accordance with Addendum 1. Final completion date will be established on the bridge delivery schedules once the bridge submittal is approved. A Construction Bulletin will be prepared and authorized once this date is determined. EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright©2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 1 of 7 • 4.02 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner per Section 100.45 of Current Version of Standard Specifications for City of Oshkosh, Wisconsin for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner per Section 100.45 of Current Version of Standard Specifications for City of Oshkosh, Wisconsin for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment. ARTICLE 5—CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A,and 5.01.B below: A. Bid Sum, a sum of: $1,232,621.00 The Bid prices for Lump Sum and Unit Price Work set forth as of the Effective Date of the Agreement are based on lump sum bid items, or undistributed quantities. As provided in Paragraph 11.03 of the General Conditions, undistributed quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer as provided in Paragraph 9.07 of the General Conditions. B. For all Work,at the prices stated in Contractor's Bid,attached hereto as an exhibit. ARTICLE 6—PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions.Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment approximately every four weeks based on the schedule provided at the Preconstruction Conference during performance of the Work as provided in EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright C 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 2 of 7 Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work, based on the number of units completed) or, in the event there is no schedule of values,as provided in the General Requirements. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions. a. 95 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage;and B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 95 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 10 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion. 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07. ARTICLE 7—INTEREST 7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of 1%per month. ARTICLE 8—CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost,progress,and performance of the Work. EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright®2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 3 of 7 D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any,that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable "technical data," and (2)reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in Paragraph SC-4.06 of the Supplementary Conditions as containing reliable "technical data." E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2)the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor's safety precautions and programs. F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement(pages 1 to 7, inclusive). 2. Performance bond(pages 1 to 3, inclusive). 3. Payment bond(pages 1 to 2, inclusive). 4. Certificate of Insurance (Contractors Insurance with Property Insurance Requirements and List AECOM Technical Services as additional insured). EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright C 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 4 of 7 5. Supplementary Conditions—City of Oshkosh(pages 800-1) 6. Supplementary Conditions(pages 810 to 813, inclusive) 7. General Conditions(pages C-700-1 to C-700-63, inclusive). 8. Addenda(number 1, inclusive). 9. Specifications as listed in the table of contents of the Project Manual. 10. Drawings consisting of 29 sheets with each sheet bearing the following general title: City Contract 19-10 Lakeshore Riverwalk I-41 to Punhoqua Street 11. Exhibits to this Agreement(enumerated as follows): a. Contractor's Bid Tabulation b. Contractor's Bid Bond c. Contractor's Signature Page d. Disclosure of Ownership e. Contractor's Subcontractor List. 12. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Notice to Proceed b. Work Change Directives. c. Change Orders. The Contract documents are complementary; what is required by one is as binding if required by all. In the event that any provision in any of the above component parts of this contract conflicts with any provision in any other of the component parts, the provision in the component part first enumerated above shall govern over any other component part with follows it numerically except as may be otherwise specifically stated. A. There are no Contract Documents other than those listed above in this Article 9. B. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions. EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright C 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 5 of 7 ARTICLE 10—MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.05 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05: 1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or(c)to deprive Owner of the benefits of free and open competition; 3. "collusive practice"means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright®2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 6 of 7 ' 4. "coercive practice" means harming or threatening to harm, directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 10.06 None EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright©2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 7 of 7 a I IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner and Contractor or on their behalf. This Agreement will be effective on June 11, 2019 (which is the Effective Date of the Agreement). OWNER: ���� CONTRACTOR: City of Oshkosh Agaa���✓T/- Payne&Dolan,I c. By: Mork_ A • Cot, toff- By: Title: 2A4L) Kay9 et' Title: Joh artoszek Vice President (If Contractor is a corporation, a partnership, or a joint vent attach evidence of authority �_ — to sign.) :4 Attest: COAtt . / Title7� t,p_w k_ (AJ rl�, 1 (t. ((,e r( .. :1 . . . . . - r •- . Address for giving notices: W. 6380 Design Drive Greenville, WI 54942 Attest: il\UX\(L I Ckilar\ Titl;:firp 13't7 "0'41-r e.\\ t.< c-113r License No.: N/A (Where applicable) NOTE TO USER: Use in those states or other jurisdictions where applicable or required. Attest Agent for service of process: Title: taingi 4. Lore4.50-1, C 4 0440fil Jake Brucker,Manager EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright C 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 8 of 7 Bond No. 30076102 Job limber: 30076102 PERFORMANCE BOND CITY OF OSHKOSH Contract Number 19-10 Date Bond Executed(Date of Contract or Later) 6/11/19 PRINCIPAL/CONTRACTOR(Legal Name and Business Address) Type of Organization PAYNE & DOLAN, INC. _Individual _Partnership W6380 Design Drive x Corporation Greenville, WI 54942 State of Incorporation WI SURETY(IES) (Legal Name(s)and Business Address(es)) Penal Sum of Bond One Million Two Hundred Thirty Two WESTERN SURETY COMPANY Thousand Six Hundred Twenty One and 151 N. Franklin Street 00/100 Dollars ($1,232,621.00) Chicago, IL 60606 OWNER(Legal Name and Business Address) CITY OF OSHKOSH 215 Church Avenue PO Box 1130 Oshkosh,Wisconsin 54903-1130 OBLIGATION The Contractor and Surety,jointly and severally,bind themselves, their heirs, executors, administrators,successors and assigns to the Owner for payment of the sum shown above or the performance of the Contract identified above,which is incorporated herein by reference. This Bond shall cover any work performed during initial construction and any warranty period required by the Contract. If there is no Owner Default to pay the Contractor as required under the Contract for work performed or to perform or complete any material term of the Contract, then the Surety(ies) obligation under this Bond shall arise after: 1. The Owner provides notice to the Contractor and Surety that the Owner is considering declaring the Contractor in default of the Contract. Within five (5) business days of the Owner's notice, either the Contractor or the Surety may request a conference with the Owner to discuss such default and the remedy therefor. If a conference is requested, the conference shall be scheduled to take place at Owner's principal place of business or another agreed upon location within five (5) business days of the request for conference. If the Owner, Contractor and Surety agree, the Contractor may be allowed a reasonable time to perform the Contract, but such agreement shall not waive the Owner's right, if any,to subsequently declare the Contractor in default; 2. The Owner declares the Contractor in default and notifies the Surety of the declaration of default;and 3. The Owner agrees to pay the balance of the Contract price in accordance with the terms of the Contract to the Surety or to a qualified Contractor selected to perform the Contract. Failure of the Owner to comply with the notice requirement specified above shall not release the Surety from its obligations. Upon notice from the Owner as provided above, the Surety shall promptly and at Surety's expense take one of the following actions: 1. Arrange for the Contractor,with consent of the Owner, to perform and complete the Contract; 2. Undertake to perform and complete the Contract itself, through qualified agents or independent contractors; 3. Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner to enter into a contract with the Owner for performance and completion of the Contract, to be secured with performance and payment bonds, and to pay to the Owner as damages any amount in excess of the original contract amount for the completion of the Contract; any additional legal, design professional, architect, or consultant fees resulting from any delay in the completion of the Contract; and any applicable liquidated damages specified within the Contract resulting from any delay in the completion of the Contract. 4. Make payment to the Owner, as soon as practicable after an amount is determined for completion of the Contract;or 5. Deny liability in whole or in part and notify the Owner, citing with specificity the reasons for such denial. If the Surety does not proceed with reasonable promptness, Owner may give notice to the Surety and the Surety shall be deemed in default on this Bond five (5) business days after notice by the Owner demanding the Surety perform its obligations under this Bond. Owner shall be entitled to enforce any remedy available to Owner upon default. Except for default of the Surety and Surety's election to perform or complete the Contract itself under Paragraph 2 above,Surety's liability shall be limited to the amount of this Bond. Notice to the Contractor or Surety shall be deemed to have been given: (i) upon delivery to an officer or person entitled to such notice, if hand delivered; or(ii) two (2) business days following deposit in the United States mail, postage prepaid; (iii) upon delivery by a commercial carrier that will certify the date and time of delivery; or (iv) upon transmission if by facsimile, email or other form of electronic transmission. Notices shall be provided to the Owner, Surety and/or Contractor at their address as specified on this Bond or to a facsimile, email or other electronic address that has been provided in writing to the other party to be used for this purpose. The laws of the State of Wisconsin shall govern the interpretation and construction of this Bond. Winnebago County shall be the venue for all disputes arising under this Bond. Any provision in this Bond that may conflict with statutory or other legal requirement shall be deemed deleted herefrom and provisions conforming to the statutory or other legal requirement shall be deemed incorporated herein. The above obligation is void if the Contractor performs and fulfills all the terms, conditions and agreements of the Contract and any authorized modifications during the term of the original Contract and any extensions thereof. Notice to the Surety is waived for any modifications agreed upon by Owner and Contractor. PAYNE & DOLAN, INC. WESTERN SURETY COMPANY Name of Principal/Contractor Name of Surety Tit Title r Kel Cody Attorney-in-Fact Bond No. 30076102 PAYMENT BOND CITY OF OSHKOSH Contract Number 19-l o Date Bond Executed(Date of Contract or Later) 6/11/19 PRINCIPAL/CONTRACTOR(Legal Name and Business Address) Type of Organization PAYNE & DOLAN, INC. Individual Partnership W6380 Design Drive Greenville, WI 54942 Corporation State of Incorporation WI SURETY(IES)(Legal Name(s) and Business Address(es)) Penal Sum of Bond WESTERN SURETY COMPANY One Million Two Hundred Thirty Two 151 N. Franklin Street Thousand Six Hundred Twenty One and Chicago, IL 60606 00/100 Dollars ($1,232,621.00) OWNER(Legal Name and Business Address) CITY OF OSHKOSH 215 Church Avenue PO Box 1130 Oshkosh,Wisconsin 54903-1130 OBLIGATION The Contractor and Surety,jointly and severally,bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Contract identified above, which is incorporated herein by reference,subject to the following terms. If the Contractor promptly makes payment of all sums due to claimants, and defends, indemnifies and holds harmless the Owner from all claims, demands, liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Contract, then the Surety and the Contractor shall have no obligation under this Bond. If there is no Owner Default to pay the Contractor as required under the Contract for work performed or to perform or complete any material term of the Contract, then the Surety(ies) obligation under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Contract and tendered defense of such claims, demands, liens or suits to the Contractor and.the Surety. Amounts owed by the Owner to Contractor under the Contract shall be used for performance of the Contract and to satisfy claims, if any, under any Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Contract are dedicated to satisfy obligations of the Contractor and Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. Upon notice and tendering of claims as specified above, the Surety shall promptly and at Surety's expense defend, indemnify and hold harmless the Owner against such claim,demand, lien or suit. Surety shall answer claimants, with a copy to Owner, within sixty (60) days of the date of the claim, stating the amount that are disputed and the specific basis for challenging any amount that is disputed or pay or arrange for payment of any undisputed amount claimed. Surety shall not be obligated to the Owner, claimants or others for obligations of the Contractor under this Bond that are unrelated to the Contract. The Owner shall not be liable for the payment of any costs or expenses of any claimant under this Bond and shall have no obligation to make payments to, or give notice on behalf of claimants, or otherwise have any obligation to claimants under this Bond. Notice to the Contractor or Surety shall be deemed to have been given: (i) upon delivery to an officer or person entitled to such notice, if hand delivered; or (ii) two (2) business days following deposit in the United States mail, postage prepaid; (iii) upon delivery by a commercial carrier that will certify the date and time of delivery; or (iv) upon transmission if by facsimile, email or other form of electronic transmission. Notices shall be provided to the Owner, Surety and/or Contractor at their address as specified on this Bond or to a facsimile, email or other electronic address that has been provided in writing to the other party to be used for this purpose. The laws of the State of Wisconsin shall govern the interpretation and construction of this Bond. Winnebago County shall be the venue for all disputes arising under this Bond. Any provision in this Bond that may conflict with statutory or other legal requirement shall be deemed deleted herefrom and provisions conforming to the statutory or other legal requirement shall be deemed incorporated herein. • PAYNE & DOLAN, INC. WESTERN SURETY COMPANY Name of Principal/Contractor Name of Surety / Ke ly Cod , Att ney-in-Fact Titl ck* ' . 7-0,--I Title Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby make,constitute and appoint Kelly Cody, Roxanne Jensen, Christopher Hoyden, Individually of Green Bay, Wisconsin Trudy A. Szalewski, Christopher H. Kondrick, Brian Krause, Individually of Milwaukee, Wisconsin Its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds,undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney,pursuant to the authority hereby given,are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof,duly adopted,as indicated,by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 8th day of February,2019. „suaEry�,, WESTERN SURETY COMPANY ........ eon =y:VO ) 'z� . ATM—;4 aul T.Bruflat,Vice President State of South Dakota 1 Jj ss County of Minnehaha On this 8th day of February,2019,before me personally came Paul T. Bruflat,to me known,who,being by me duly sworn,did depose and say: that he resides in the City of Sioux Falls,State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires J.MOHR NOTARY June 23,2021 samr oA g, C;47)9A-IIA--J J.Mohr,Notary Public CERTIFICATE I, L. Nelson,Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force,and further certify that the By-Law of the corporation printof on the reverse hstr f is still in force. In testimony1 whereof I have hereunto subscribed my name and affixed the seal of the said corporation this d• day of on J v, ,✓V/9 WESTERN SURETY COMPANY Was?4QPOggl�o 4'ouT N n o1F"` L.Nelson,Assistant Secretary Form F4280-7-2012 Go to www.cnasuretvcom>Owner/Obligee Services>Validate Bond Coverage,if you want to verify bond authenticity. Authorizing By-Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile.