Loading...
HomeMy WebLinkAbout09. 19-408 JULY 23, 2019 19-408 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID TO MIDLAND ENGINEERING CO. INC. FOR CARRIAGE HOUSE ROOF REPLACEMENT FOR OSHKOSH PUBLIC MUSEUM ($384,700.00) INITIATED BY: PURCHASING WHEREAS, the City of Oshkosh has heretofore advertised for bids for the Carriage House Roof Replacement for the Oshkosh Public Museum; and WHEREAS, upon the opening and tabulation of bids, the following is the only bid: MIDLAND ENGINEERING CO. INC. 52369 State Road 933 North South Bend, IN 46637 Total Bid: $384,700.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0323-0130-7214-06835 Property/Equipment Fund - Buildings 0323-0130-7214-06935 Property/Equipment Fund - Buildings #02) City of Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: July 16, 2019 RE: Award Bid to Midland Engineering Co. Inc. for Carriage House Roof Replacement for Oshkosh Public Museum($384,700.00) BACKGROUND The Facilities Maintenance Division works closely with our roofing engineers from Specialty Engineering Group (SEG) to regularly monitor, update and prioritize the annual Roofing Replacement Schedule for our buildings. The 2019 CIP Roofing/HVAC CIP has been allocated $500,000.00. The Oshkosh Public Museum Carriage House roof is highest on the roof replacement schedule given the age and poor condition of the building's existing roof tile and components. The building houses many of the Museum's valuable artifacts. Since its install circa 1992, the slate roof's EPDM synthetic rubber roofing membrane section has failed between the dormers on the southwest elevation leading to significant concerns about the roof's ability to remain watertight. The deterioration of the original and synthetic slate section over the last 27 years has left several slate roof tile units cracked, split, missing, or with holes or other visible imperfections, making repair or relaying of the current roof elements impractical and cost prohibitive for the value received. The only solution for the roof is a full replacement of the slate tiles including all gutters,valleys and other roof components.The replacement roof materials will be artificial slate. ANALYSIS Working with SEG,Museum and Facilities Maintenance staff,Purchasing prepared bid specifications for this project. Given that the Carriage House is on the National Register of Historic Places, the bid specifications were reviewed and approved by the Wisconsin State Historic Preservation Office. The scope of this roof replacement requires contractors skilled in slate tile roof. The contractor base for slate tile roofing firms is small, as is the availability of projects of this type and available skilled labor. The bid was advertised in the local newspaper and posted on Demandstar. The bid was also sent to known regional slate roofing contractors. Bids were due June 25, 2019. Midland Engineering was the only bidder at the mandatory pre-bid meeting and provided the only bid for the project. Midland met all the minimum bid requirements. The bid tab is attached. Midland is a larger contractor that performs slate and artificial slate tile roofing. Their client list includes churches and universities with intricate and detailed slate tile roofs. SEG's follow up with Midland's references resulted in excellent recommendations for the quality of their work, their project management team and their ability to keep projects on schedule and within budget. SEG's follow up also found that Midland's bids were within the competitive parameters of their peers. In consideration of Midland's expertise in slate roofing, their outstanding references, their competitive bid relative to the scope of this project and their ability to City Hall,215 Church Avenue P.O.Box 1 130 Oshkosh,WI 54903-1 130 http://www.ci.oshkosh.wi.us complete the Carriage House roof in 2019, it is the consensus of City staff that we recommend award of this bid to their firm. FISCAL IMPACT The fiscal impact of this bid is$384,700.00. This bid, added to SEG's engineering fee of$15,000.00 brings the total fiscal impact of this project to $399,700.00. The Roofing/HVAC Fund is allocated $500,000.00 annually and has sufficient funds for this project. This project will be charged to A/N# 0323-0130-7214- 06835 and 0323-0130-7214-06935. RECOMMENDATION Purchasing recommends the Common Council award this bid to Midland Engineering Co. Inc. for $384,700.00. Respectfully Submitted, Approved: L__ r Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager BID TAB OSHKOSH PUBLIC MUSEUM CARRIAGE HOUSE ROOF REPLACEMENT BIDS OPENED JUNE 25, 2019 VENDOR INFORMATION BID INFORMATION Midland Engineering Company. Inc. 52369 State Road 933 North South Bend IN 46637 BID $384,700.00 PREQUAL YES BID BOND YES